We have a DMG MORI NHX5000 horizontal mill with a M730BM system and I need some info on the Pallet change procedure in memory mode ie How is it called in the Program so that the machine knows which pallet is in production.
We have a DMG MORI NHX5000 horizontal mill with a M730BM system and I need some info on the Pallet change procedure in memory mode ie How is it called in the Program so that the machine knows which pallet is in production.
M60-pallet change
M61-A pallet change
M62-B pallet change
M62 does not work as it assigned to another function.
Well, thats what i got. Mori typically never changes mcodes.
I am not sure the NV5000 1A/50 ( Vertical Mill ) is the same of your or not, try this by manually:
Hit Setting Soft Key to find APC ( Auto Pallet Change _ and try the list of function on it:
For Ex. Pallet A/B shuttle Clamp / Un clamp ( Before moving or rotating a pallet A or B )
Pallet A or B Forward / Backward ( To Pull out or move back a pallet )
Pallet A or B lock / unlock ( Lock: After moving a pallet back to its home _ Un lock for going to move to inside machine )
My machine is Vertical Milling, and has the same M code 60, 61 and 62 as Underthetire post.
Good luck.
Hello,
do you still have problem with pallet change?
I know from my experience, that when I install new machine from MORI SEIKI we need to input programs for APC and ATC into machine.
Please check parameter #7011 (60) and #7013 (9002). O9002 we made program for APC.
When you put in MDI or into the program, witch you made, just put M60.
If you need help, contact me by e-mail...
Dear Sir.
i have the lathe machine with the same controller M730BM.
But, unfortunately i no have any attached manual of this.
So, Can you share with me if you can.
I am very grateful with your support.
Best Regards.
Dear Sir.
This is my email address:vanthuongeba@gmail.com.
I need the manual that related to the M730MB controller.
Please Share with me if you can.
Thanks you so much for your support.