that didn't split correctly $1 an $2
[QUOTE=carmstrongls1;1226119]If the cycel time is not a huge concern then use G650 commands to support the thread with the sub spindle. If you do this it doesn't matter how long the thread is as long as it can be grabbed in one single chucking amount. wait... Is this a citizen machine?
L-20 and A32 I use G32
A20 machine G650
G650- Machining mode change to superimpose Z2 on to Z1. G650 will queue
with both lines $1-$2 then with M130, make Z2 follow Z1.
Example -when we pick up a part and chamfer we while we have the
back spindle collet closed on the part. Also if we are using Z2
as a work support.
Also Automaticly $1-G99 is for S1 and $2-G99 is for S2.
Note- Any shift, "G50W-.125", on Z1 must be canceled, "G50W.125", before
G650 or G650 won't find the face of the part!
$1
G650
!2L650
G50W-.125
(moving Z1)
G1X-.1F.001
G600
G50W.125 S1=1500
M7
G0X-.1Z-.005T0
M56
G999
N999
M2
M99
$2
G650
G0 Z-.1(bring Z2 to Z1-.1)
G1Z1.F.05(feed over)
M15(close collet)
!1L650(let $1 continue)
G600(bring Z2 back)
M25
G999
N999
M2
M99