Okuma twin spindle - Synchronization - G140 G141 M110
Hi and sorry for my english
I use a Multus U3000 and i have a question
I have to move one part from the first spindle to the second spindle
Of course, work all, synchronization are ok if i use M210 M151 M883
But i have to make one part in the spindle A from the bar and on the second spindle i have a support with screw, so i have to move the second spindle to the piece
And put a screw
I want use in the spindle A and spindle B an M110 code... for perfect synchronization, put the screw, restart
But if i have M110 code in G140, i can't put M110 code in G141 (i can only if i change prossimity position)
Any idea for have all two spindle in M110?
That is the problem!
Thank you so much to all
Re: Okuma twin spindle - Synchronization - G140 G141 M110
hy andy :) try this program :
G140
M110
G00 C30
VCPPH=90
M892
maybe it works :) if not, pls share an image with your setup, maybe something can be done without c axis / kindly :)
Re: Okuma twin spindle - Synchronization - G140 G141 M110
M110 synchronization on both spindles requires special software specification from Okuma and is an option. M151 is as accurate as M110. The same encoders are used. You should be able to perform the M151 then go to a M0 install your screw and then cycle start all while the M151 is active. M151 is perfect synchronization and can be adjusted by parameter for alignment position. It can start, stop, reverse, use M1 or M0, go into mid-auto-manual, jog spindles manually, and go back to auto and cycle start all without losing the M151. Nobody in the industry does it as well.
Will this work for what you are trying to accomplish?
Best regards,
Re: Okuma twin spindle - Synchronization - G140 G141 M110
hello :) M697 allows transfer accuracy equivalent to c axis, otherwise accuracy decreases with rpm, yet it is still ok for most operations on normal lathes
gang lathes, being able to rev higher, have more phase error; citizen has an interlock for that / kindly :)
1 Attachment(s)
Re: Okuma twin spindle - Synchronization - G140 G141 M110
Quote:
Nobody in the industry does it as well
hy mr wizard :) if you wish, pls check attached : manual says 0.1degres at 1000rpm ( and maybe proportionally for each 1000rpm more ), and that's <0.09 on the circumference of a part of 100 diameter
it should be enough for most transfer applications, it's a lathe after all :)
Re: Okuma twin spindle - Synchronization - G140 G141 M110
M151 of course work amazing, but M151 want A spindle close and B spindle OPEN
So i have to move the prossimity for work with M151 in this situation...
M696 don't work :(
Re: Okuma twin spindle - Synchronization - G140 G141 M110
Ah… but there is a special system parameter VCHIO which can be used to change from OD to ID chucking thus faking out chuck open interlock.
Should do the trick for you.
Best regards,
VCHIO=0
M151
VCHIO=1
Re: Okuma twin spindle - Synchronization - G140 G141 M110
i try but don't work!
I need to change in parameters anything?
My machine don't accept VCHIO :(
Re: Okuma twin spindle - Synchronization - G140 G141 M110
on OSP-U100 work, on OSP-P300 don't work :D
Re: Okuma twin spindle - Synchronization - G140 G141 M110
hy :) on p300, use M883 M151 M210 instead of vchio; pls share more infos, if you need to keep spindle phasing, so to see a work arround
M696/697 is spec, not default / kindly :)
Re: Okuma twin spindle - Synchronization - G140 G141 M110
nothing, if all two chuck are closed don't work. Only if B chuck is open that work.
Need to try some different... or i try to send photo for better explication, bad english here :D
Re: Okuma twin spindle - Synchronization - G140 G141 M110
Recap :D
LB300-M with OSP-U100L, work
LB3000 EXII with OSP-P300L, alarm "2203-01 Alarm-B"
Multus U3000 with OSP-P300SA, alarm "2203-01 Alarm-B"
Alarm is like "system variable non registered", "use other variable"
I don't know how to "open" this variable on OSP300...
Maybe european version can't change this for security?
I have M185 option so i don't know why don't work VCHIO on OSP300
Re: Okuma twin spindle - Synchronization - G140 G141 M110
hello :) on p300 is only possible to read vchio, not also to write it, thus is not possible to use = after vchio
there is a key on the panel for od/id chucking selection; if "vchio=" would work, then this could leave to a conflict, unless an interlock is used
my guess is that on controls where "vchio=" works, chucking selection is being set from display only
Quote:
I have M185 option so i don't know why don't work VCHIO on OSP300
M185 and VCHIO are separate things
Quote:
Need to try some different... or i try to send photo for better explication
just share something :)
Re: Okuma twin spindle - Synchronization - G140 G141 M110
Okuma Japan can make a special program for me, but the function i need don't exist :D
So the problem is solving...
Re: Okuma twin spindle - Synchronization - G140 G141 M110
Can I ask from very beginning?
You want to transfer the workpiece from A spindle to the B spindle. You don't use the chuck on the B spindle, you use the screw instead. Since you don't need a detection of missclamp on the B spindle, you can adjust the drawtube and limit sensors the way that the draw tube will not move on open command.
Re: Okuma twin spindle - Synchronization - G140 G141 M110
Did the M883 work for you? I think the VCHIO was discontinued due to the M883 being added.
Best regards,
Re: Okuma twin spindle - Synchronization - G140 G141 M110
Quote:
Hi and sorry for my english
hy andy :) is ok, i speak code, then english ...
Quote:
I use a Multus U3000 and i have a question
... i have a support with screw ...
Any idea for have all two spindle in M110?
That is the problem!
if you still need help, i can do it; recently, i deal with multus, but what you need is not necesarly multus related, but a thing for any oposed spindle lathe / kindly :)