501,873 active members
966 visitors online
Register for free
Login

Search:

Type: Posts; User: bildoo

Page 1 of 3 1 2 3

Search: Search took 0.00 seconds.

  1. Replies
    4
    Views
    3,657

    Re: Mazatrol T32-2 Rs232 communication issues

    Be sure that the Data Bits are set at "7" on the PC and "8" on the control. This is a mismatch because someone did not count right at Mazak years ago.
  2. That machine is probably one of the best built...

    That machine is probably one of the best built machine Mazak ever made. Crash it, bash it this thing is tough as nails. Our shop has a 1992 model and we start out the newbies on it. In the 9 years...
  3. Replies
    4
    Views
    578

    Data bits is wrong.

    Try setting the machine to 8 stop bits and the computer to 7.
  4. Replies
    8
    Views
    2,133

    M Codes

    I checked today and M911/M71 both work and so does M912/M72 for pallet change.
  5. Replies
    8
    Views
    2,133

    Mcode

    M911 for pallet one (right side)
    M912 for pallet two (left side)

    Also do not shut off the machine when it is on pallet 2. It is a pain to get it homed out again because the wall is in the way in...
  6. Replies
    4
    Views
    1,386

    I very rarely program in G code. But, Alarm 844...

    I very rarely program in G code. But, Alarm 844 says there is a subprogram call for a program that is not registered. By guess is that the Macro program for G83 is missing. There is a hidden set of...
  7. Replies
    2
    Views
    389

    Check the stop bits

    Some one at Mazak couldn't count right. Check to make sure the computer is on 7 stop bits and the mazak is on 8.
  8. Replies
    6
    Views
    221

    I flipped through the entire parameter manual and...

    I flipped through the entire parameter manual and the only parameter that might cause this is F19. (deals with arc and radius error) Compare this between the two machines and let me know.
  9. Replies
    3
    Views
    474

    Any tool used in an EIA program will not show up...

    Any tool used in an EIA program will not show up in the tool layout page. Only ones used in mazatrol.

    I think your parameters should be:

    F91: 00100010
    F92 is ok
    F93 is ok

    I don't have the...
  10. Replies
    6
    Views
    221

    Sorry I forgot.

    I totally forgot to look for the parameter for you. I will look on Friday when I get back to work.
  11. Replies
    3
    Views
    474

    tool change parameters for eia

    Look in the front of the electrical manual and there is some plc parameters (R).
    There is ones for the language of the tool change command (ie. T01M6 OR T01T00M06) set this for how you want it. ...
  12. Replies
    6
    Views
    221

    Check Parameter F70

    You might want to check parameter F70 and make it a 1. I looked back and saw I had answered a question for you on offsetting an EIA progam called from a Mazatrol. Maybe for some reason this...
  13. Parameter

    Parameter F
    70 needs to be a 1. This will allow the offest to carry to an eia program.
  14. Replies
    2
    Views
    183

    VariAxis Programmer salay?

    Just trying to figure out if I'm on the same pay scale as other Variaxis programmers. I make $21/hr. I program and run (Mazatrol and G-code) a Variaxis 730-2 and also program and run another Mazak...
  15. Replies
    2
    Views
    372

    Handwheel maybe problem

    We had this issue on 2 of these machines. We found that when you put the remote handwheel back on the machine the magents cause it to slap on causing a partial e-stop. To correct this press the...
  16. Thread: Strange Alarm

    by bildoo
    Replies
    2
    Views
    408

    R.D. Low Battery Alarm

    The R.D. is the relocation device. This device trips making the machine inoperable when the machine is moved. Once tripped (will trip if battery dies) only Mazak can reset by sending out a tech. ...
  17. Replies
    10
    Views
    1,328

    Good to hear

    I was just about to reply to you to put the M212 before the move line. Is that what you had to do?
  18. Replies
    10
    Views
    1,328

    Alarm 128

    Alarm 128 comes up because you are trying to move the C axis with the C axis brake (clamp) on. You must put a M43 before the C move. If you are cutting using the C axis to feed I would put this at...
  19. Replies
    3
    Views
    575

    Chamfer

    In your case I would use a circle mill unit and describe a chamfer on the hole. Then just erase the endmill out of the unit. This will make the cutter just plunge down to make the cut. You may...
  20. Thread: inspection plus

    by bildoo
    Replies
    4
    Views
    503

    Instructions

    I have seen the instructions for inspection plus in the operating manual. If it is not there there should be a seperate manual.
  21. Replies
    15
    Views
    1,194

    PLC parameter

    There is a PLC parameter to set the language needed for a tool change. Look in the elecrical manual at the plc parameters (R's). The one that needs to be changed is the one that says "tool change...
  22. Replies
    13
    Views
    811

    I just noticed you are from Iran. My thinking is...

    I just noticed you are from Iran. My thinking is with current US and Japan sanctions against your country I know you will not get help from Mazak. This is the purpose of the R.D. device. These...
  23. Replies
    13
    Views
    811

    R.D. error

    R.D. stands for relocation device. This detects when the machine is moved and tripps something in the control so it does not work. This is how Mazak keeps track on where their machines are. (so...
  24. Replies
    2
    Views
    319

    Its been a few years since I ran a mazak lathe...

    Its been a few years since I ran a mazak lathe but on a qt250 and a sqt250msy running DOC .18 to .22 at 850 sfm .012 in/rev in carbon steel worked very well using wnmg (trigon) inserts. Even deeper...
  25. Replies
    7
    Views
    416

    try pre drilling out the corners, then with such...

    try pre drilling out the corners, then with such a long tool maybe only step down .03 in depth each pass. then do 2 or more finish passes. i have had good luck with using solid carbide endmills...
Results 1 to 25 of 55
Page 1 of 3 1 2 3