I bought a D&M 5 lathe at an auction. The front panel control was messed up- broken switches etc. Last week I tried to get some info from LabVolt and after a few exchanges with e-mail support, I was...
Type: Posts; User: NutmegTech
I bought a D&M 5 lathe at an auction. The front panel control was messed up- broken switches etc. Last week I tried to get some info from LabVolt and after a few exchanges with e-mail support, I was...
We once bought a horizontal from a dealer that we did a lot of business with. We bought it at Eastec and got a good deal on it (compared to a Hitachi-Seiki) After it was delivered and while their...
How about using a countersink to remove the burr? Depnding on how your drilling fixture is made, you can use it to hold the rivet for this operation.
Brian
Jim-
That's about what we are charged to recharge our tank for a Mitsubishi FA10. We have 2 tanks in-line and we have to send one out about every 5 months or so. The machine doesn't run all...
Some components are sold in certain lengths-threaded rod, linear shafting, etc. and you will need to know what size machine to get the right amount of material with out waste. It doesn't really...
jrick- if you are doing production work on these machines and are currently not producing, it may be a good idea to have the factory tech come in and reset the machine. $150/hr may be a lot of $ but...
Chipmaker6- We purchased the one-on-one computer & telephone type training sessions. I believe it was $500 for 5 hours. They can be broken up into smaller sessions. That helped us out a lot. We could...
Being an employer and having gone through a similar situation from the other side, I can tell you its not a good situation. We let an employee have almost complete control over design and CNC...
Silly Putty works well.