Hi,
I wish to do a job requiring 2 tools in 3 Work Coordinates System (WCS) : G54, G55 and G56.
Tool 1 must work in each WCS before changing to Tool 2.
I use the option "Multiple WCS Offsets /...
Type: Posts; User: Gait12
Hi,
I wish to do a job requiring 2 tools in 3 Work Coordinates System (WCS) : G54, G55 and G56.
Tool 1 must work in each WCS before changing to Tool 2.
I use the option "Multiple WCS Offsets /...