98% of what I do is climb cut. I use G42 to make a bore larger with a positive number in the control is all.
Type: Posts; User: 1320feet
98% of what I do is climb cut. I use G42 to make a bore larger with a positive number in the control is all.
To setup a boring bar is time consuming. To add a reamer to the tool changer also adds time. I almost always have a 1/8, 1/4, 3/8, 1/2, and a 3/4 endmill in the tool changer. So I grab one of those...
This is how I use to do it. It was very time consuming when reloading large files into the Mori though a serial cable. So I now make the hole in Mastercam .001 to .002 smaller than I need. I then cut...
If you had to finish a bore that was to be .500 plus or minus .0002 with an end mill, how would one get there without offsets?
One thing I never mentioned is I'm using cutter comp for fine tuning a dimension. I am using Mastercam for the main cutter offset.
This worked and the comp was engaged on line N830.
If I change this N820 G0 G40 G90 G56 X10.6931 Y-2.9598 S10000 M3
to this N820 G0 G40 G90 G56 X9.6931 Y-2.9598 S10000 M3 it will move to the same position as the previous line watching...
It is still in G0 so no feed rate is needed. I thought N830 should move the .05 I had in radius offset. G8 P1 is turning on high speed look ahead.
The G40 was not there when I started. I had entered it after to see if it made any difference.
My machine will not move in cutter comp today.
I inserted .05 for tool 3 in radius offset. I then watch the machine coordinates between line N825 and N830 and nothing moves.
Machine is at X-11.1416...
472468
- - - Updated - - -
472470472472
The machine has a 4500 RPM limit in its specs from Okuma.
I would like to move the limit from 3800 to 4200 and I get the error seen in the attached photo when I try. Is there another parameter else where?
I have a captain 2007 L370 with osp-p200l control I recently change the chuck on. Went from a Kitagawa BL210 to a B-210. This B-210 is rated at 4200 RPM and the machine user parameter (allowable...
I needed to be in manual mode. Thanks OkumaWiz.
On start up, the screen displays (please open door). It does not unlock the door. This is a newly acquired 2007 L370 with P200L control. It was setup with auto door and a robot. Robot is now out of...
Hi Dave.
Thanks for the explanation.
I have book marked that link.
Thanks
Howard
Hi gentle
Here is the order of the buttons I pressed.
system
pmc
pmcprm
data
g.data
page down several times.
I broke down and talked to David at DMG Mori. He was able to resolve this within minutes. I changed parameter K461 from a 3 to a 1. Hopefully this will help the next person.20191016_110948.jpg430934
Thank You Gentlegiant. You got me looking in the right area, me thinks. I have not found 1 setting between the 2 controls that differ as of yet. Thanks again.
Hi Gentlegiant
I never mentioned in the 1st post that the door unlocks at M00 as well as the spindle releasing. The door and spindle does not unlock on the other machine.
I found the following in...
Hi Gentlegiant. I have compared the 2 parameter lists and I was unable to locate anything that was obvious. I've never done anything with the ladder before. I believe that's where I need to be. I...
I have 2 1998 mori seiki sv500s made within a month of each other. I have a haimler taster as tool #1 for setting work offsets. I use it to adjust offsets on every part sometimes. following will be...
My SV500B maintenance manual shows SV500B coolant capacity at 400 liters or 105gals. I Do not have a book on the SV400.
I have used both Oemeta novamet 100 and Blasocut BC940 and they both eat the...
On my SV500 with 4th axis and 18IA control. It's parameter 12 on line A that I change bit7 to a 1.
This is from a 1998 SV500. The gear has 17 teeth. I'm unable to measure the diameter without disassembly. I was able to measure the width between the racks at .930". ...
I have a SV500 and I'm looking at a newer NV5000 and was wondering if the NV is as rigid as the older SV machine? The Z axis column to me on the SV machine looks to be far more rigid in its design.
Thanks for the interchange Underthetire. I had no luck finding a used pair, and for what its worth I was quoted $762.00 each from Ellision. I ended up building my own.
I ended up making my own set. I ran them on my old machine ( AWEA AV1000 ) as that was easier than changing all the tools by hand on the mori.
307744