and the boss head most likely will have the erickson 30 taper or quik 200 spindle for quick change tooling
Type: Posts; User: mongoose
and the boss head most likely will have the erickson 30 taper or quik 200 spindle for quick change tooling
i second that !
here are a couple i have for current / future retrofits
boss cnc head
hiedenhain conversion
centroid conversion ( i think this is the elrod kit )
Hey guys,
have a buddy that needs the operating system software for the Torq Cut 30.
anyone have a copy they are willing to share or sell ?
thanks
mesa board doesn't work with mach 3 ?
Mac, thanks for the input.. i have reached out to this company to find out the input amps... The rated output current (A) is 10.5 and the rated input current (A) is 23.9 / 12.5 depending upon if you...
here is the gear.. waiting on my VFD but i will be mounting the rest while i wait !
color matches pretty good ! lol now ill start mounting the electronics !!! Centroid Acorn stay tuned
Ok Gang, its been awhile... have been working on the Rigid Ram for the most part.. have the old electronics stripped out.. the machine cleaned, the oilers replaced and the control cabined blasted...
thanks Mac,
this is the drive i ended up ordering
10.5 FLA and includes braking transistor
https://www.factorymation.com/TD400-2003-13PH
the bigger ones were all 3 phase input so hope...
Hey Guys, back to my boss .. typical 2 hp motor .. what's my best choice for VFD
thanks !
Joe
ok Jim thanks !!!
Jim, what im concerned with here is the x oilers.. the grub screw seem like they adjust the amount of oil that goes to the x dovetails versus the x ways i guess the ways would need more oil than...
very nice Mac !
Would love to see some pictures Mac !!
Hey Guys,
anyone familiar with the oiling systems on the Boss machines ? so far i have rebuilt the Bijur pump / changed the filter, threw all the manifolds in the ultrasonic cleaner, blew out all...
Hey guys,
getting back to working on my boss machine and i notice im not getting any oil to most of the ways.. pump is working fine so i am thinking the metering blocks are plugged..
any...
looks good ! are you powering the knee to be your z axis ?
if you want to send a truck, ill trade you a nice manual bridgeport for it !!
Joe
Mactec, after wrestling with the bijur oil pump for 2 days im ready to concede and purchase this pump you recommend.. any idea if it is the 4mm or 6mm model ? it will be coming from china so i...
i have a couple of the rigid ram boss' and a couple of the boards left if you need them.. for the most part gutted the controls to upgrade them
Hey Guys,
hope this is the right place for this.. if not delete or move so i have gutted 4 boss bridgeports... and im not going to re-use any of this stuff
does anyone need this or should i...
as far as coolant tanks.. im going to use the one i got with the machine.. ill be building a chip tray similar to the oem version and just be using the 2 table drains
looks like you are making some good progress !!! my build has been sidelined for the moment but following along !
i am parting out my 145 i have all 3 motors if you are interested.. the 145 head unit has already been sold it was in complete working condition when taken out of service
thanks for the pic Mac... well as far as the oilers are concerned i actually dis-assembled the Bijur cleaned it thouroughly, changed the filter and tested it completely.. you have to be careful as...
Mac, do you recommend upgrading the machine oiler to some other method ? is your chip guard mounted in the t slots like the oem unit ?
thanks !
JOe
Looks like its in great shape ! i would think if you see a ALL the ways being lubed you should be good.. or possibly figure a single point hookup before each metering valve ... and you could...
post up some pics.. maybe !
DB, looking good ! i know what you are saying about those rubber covers, but all the boss' i have run into over the years have exceptional ways.. so they must work ! Im hoping to build an...
DMM Tech has em...