bump
Type: Posts; User: matesz0147
Thanks found it in optional parameter.
i dont know how i passed it over before when i was looking.
i will do .02 rather safe then sorry.
I have looked but no success.
What I am trying to do is change the point after it Rapids out and rapids back in, before it starts to feed again.
Right now when it rapids back in the hole it...
Before ppl tell me to ask Mastercam or a third party let me say that they haven't paid since x5 so I have no support. not my fault company is cheap.
Okuma control is osp-p200ma
so up to now I...
I will try solution 2 when this job finishes running. but for now i can 0 out the variable at the beginning and end of the shift.
one thing about machining is there is always room to learn more.
when it is running program restart it does not actually use the m84 code it just reads it. but i need to do this so i can center drill as close to the chuck as possible then pull part out.
the Q...
program cycle time is 2 min and some seconds a peice. so to maximize production running a whole bar without stopping saves time cause its not up to the operator to hit cycle start again it just runs...
the program is below thankyou for your help
this works for looping the program but i loop the program by calling a subprogram with a Q value. i was just looking for something to just add as a +1 each time i cut off parts. i dont need it to...
Good morning gentleman,
. I am in need of some help. i have a okuma osp-200l and we are running bar stock. i have the program looping the desired amount of time all that is going good. i get 11 pcs...