    Sharp Mill retrofit

    I finally finished my Sharp LMV retrofit. Mach 2 control, Pacific Scientific AC brushless servos on X, Y and knee. Ballscrews on X and Y. Gas springs on knee.

    Regards,
    Rick
    Attached Thumbnails Attached Thumbnails before-IMGP0440.jpg   completed-Sharp-Mach2-Mill-.jpg  

  2. #2
    Join Date
    Mar 2004
    Posts
    1661
    Well done!
    Are you satisfied with the result?

  3. #3
    Join Date
    Jun 2004
    Posts
    48
    Well, it's still a work in progress. I still have about .002" backlash in the knee I have to look into. But I am happy to finally have it running. X and Y ballscrews are running well with little to no backlash. I still have dials on X, Y, and knee along with a 3 axis Newall DRO because I am a new machinist-hobbiest, and I still expect to use the machine manually alot while I'm learning.

    I would like to take a moment to thank my instructors at De Anza College Department of Manufacturing and CNC Technology for their instruction and help with my project and for teaching me some basics of manual and CNC machining. I have so much to learn. Many thanks to Mike Appio, Scott Wigginton, Larry Brown, Mike Engle, Loren Beall, and especially Chris Newell, without whom I could not have done this project .

    First cuts on my machine are dedicated to them. It is the Manufacturing and CNC Technology Department logo. Thank you all.
    Attached Thumbnails Attached Thumbnails First-cut.jpg   Logo-closeup.jpg  

  4. #4
    Join Date
    Apr 2004
    Posts
    4

    sharp cnc ballscrews

    I am thinking of doing the same to my sharp mill.
    Where did you get the ballscrews? my table is 50" sort of odd ball,
    I have only cnc on the knee so far. I used a dc gearbox motor and timing
    chain drive . this allows the full weight of the knee to be moved with ease
    and feedback is via a rsf glass scale on the knee. It takes a while to settle
    but repeats to better than .0001. some dc bias (offset) on the motor makes
    up down motion equal and allows for manual operation with a 8" handwheel

  5. #5
    Join Date
    Jun 2004
    Posts
    48
    propclock,

    I got my Hiwin ground ballscrews for X&Y along with the motor mounts from HS&S Machine Tool in Santa Clara, CA. See www.hsands.com and call and ask for John Servin.

    They used to do Sharp Mill retrofits, and he had a few leftover parts. I'm not sure if he still has anymore. If not, I have the drawings for the Hiwin parts so you could have some made.

    The ballscrews I got came long, and I had to shorten the ends of both the X and the Y. I think they were probably made for the 50" table instead of my 42". Otherwise, the ballnuts fit perfectly in the yoke with some drilling and tapping for fastening screws. I will try to post more details of my retrofit as time allows if there is interest. Otherwise, let me know if you have questions.

    Regards,
    Rick

  6. #6
    Join Date
    Jun 2004
    Posts
    48

    At the beginning...

    It's raining the day the rigger comes to pick up my mill at the tool dealer, so we wrap it up. It's loaded on the forklift then onto the flatbed truck. Then on the way home.
    Attached Thumbnails Attached Thumbnails on-forklift-IMGP0423.jpg  

  7. #7
    Join Date
    Jun 2004
    Posts
    48
    After acquiring the ballscrews, motor mounts, motors, and drives, work is started to take things apart. I took alot a pictures because I've never done this before, and it's all got to go back together again later.

    Started by taking off the X and Y acme leadscrews, loosened the gibs on the table, and slid the table onto a melamine board at the same height by adjusting the knee height. I was surprised how easy it was to slide.

    This gets us to the yoke. The stock yoke only references the bore for the bronze acme nuts, but the ballnuts reference the faces of the yoke so I need to machine the faces square to each other and the bore/ mounting flange.
    Attached Thumbnails Attached Thumbnails table-off-111-1170_IMG.jpg   yoke-exposed111-1156_IMG.jpg   yoke111-1174_IMG.jpg  

  8. #8
    Join Date
    Jun 2004
    Posts
    48
    I used an angle iron as a fixture to mount the yoke so I could square the faces to the bores and mounting flange. I mounted the yoke by the flange to the angle iron after drilling and tapping the angle iron. I used a dial test indicator with a long point to orient the bores square to each other and the fixture on a surface plate.

    I first squared the faces of the yoke on the surface grinder, then drilled and tapped the faces for the ballnut mounting screws.
    Attached Thumbnails Attached Thumbnails yoke-bolted-to-angleIMGP061.jpg   finished-yokeIMGP0619.jpg  

  9. #9
    Join Date
    Jun 2004
    Posts
    48
    Next problem is the motor mounting flanges don't match the motor mounts I have so I need to make adapters. A circular pocket is needed so this will be my first CNC program. Luckily the Haas mini-mill VMC I used has a circular pocket canned cycle.

    After I make the adapters I need to modify the Y axis mount for the adapter or my motor shaft will be too short. Last photo is the trial fit of the Y axis motor mount assembly.
    Attached Thumbnails Attached Thumbnails motor-flangeIMGP0767.jpg   X-adapter-IMGP1385.jpg   Y-adapter-IMGP1457.jpg   Z-adapter-IMGP1503.jpg  

    Y-mount-and-adapterIMGP0903.jpg   Y-trial-fitIMGP0850.jpg  

  10. #10
    Join Date
    Jun 2004
    Posts
    48
    Since I'm new to this, I don't know whether I'll need the dials and handwheels or not, so I opt to have no regrets and plan to place dials and handwheels. This requires extending the X, Y and knee shafts. I learn to single point thread on a lathe first. I also learn to mill a keyway and broach a keyway in the dial holders.
    Attached Thumbnails Attached Thumbnails X-axis-R-extension-IMGP1494.jpg   Y-axis-extension-IMGP1495.jpg   Y-dial-holder-IMGP1094.jpg   broached-X-dial-holder-114-.jpg  


  11. #11
    Join Date
    Jun 2004
    Posts
    48
    I bought a knee mount from www.cncauto.com and both the knee and X axis mounts needed a little massaging to fit the knee at the desired angle and for the mounting adapters and slack for fitting the pulley.
    Attached Thumbnails Attached Thumbnails Z-mount-a-IMGP1407.jpg   Z-mount-b-IMGP1405.jpg   X-mount-a-IMGP1401.jpg   X-mount-b-IMGP1402.jpg  

    X-bearing-mount-R-IMGP1379.jpg  

  12. #12
    Join Date
    Jun 2004
    Posts
    48
    Now for my big moment. I need to machine the left end of the X axis ballscrew which requires a keyway and single point threading the end. I don't want to mess this up or I'll be buying another expensive ballscrew.

    First I make a support with a leftover ball bearing so the ballscrew won't whip. Then I carefully machined the end.
    Attached Thumbnails Attached Thumbnails Ballscrew-in-lathe-115-1581.jpg   threaded-X-ballscrew-end-11.jpg  

  13. #13
    Join Date
    Jun 2004
    Posts
    48
    Now it's on to spacers. I make a spacer for the left end of the table because the thread on the ballscrew is a little too long for my 42" table. I made the spacer a little thicker as I decided it would be easier to fine tune the dimension for zero slop with a spacer on the ballscrew shaft versus trying to get the thickness of the table spacer exactly right.

    My knee mount also needs a spacer between it and the jackshaft bearing holder.
    Attached Thumbnails Attached Thumbnails X-spacer-IMGP1462.jpg   X-axis-L-ballscrew-end-IMGP.jpg   need-for-Z-spacer-A-IMGP128.jpg   Z-mount-spacer-IMGP1282.jpg  

    spacer-for-Z-114-1483_IMG.jpg  

  14. #14
    Join Date
    Jun 2004
    Posts
    48
    Assembly time. Added one shot lube lines for the ballnuts. Installed the ballscrews and knee jackshaft. I had to heat the bearing housing in the knee near the pinion to get the bearing back in.
    Attached Thumbnails Attached Thumbnails add-lube-lines-IMGP1297.jpg   X-lube-line-IMGP1351.jpg   Y-lube-line-IMGP1336.jpg   ballscrews-in-IMGP1373.jpg  


  15. #15
    Join Date
    Jun 2004
    Posts
    48
    I used dial indicators to center the ballscrew shafts in the center of their deflections while fastening the bearing mounts. Then motors and pulleys on and set belt tension.
    Attached Thumbnails Attached Thumbnails indicating-L-X-IMGP1669.jpg   indicating-R-X-IMGP1653.jpg   indicating-Y-IMGP1511.jpg   X-pulley-on-IMGP1667.jpg  

    motor-and-belt-on-Y-IMGP152.jpg  

  16. #16
    Join Date
    Jun 2004
    Posts
    48
    X, Y, and Knee motor mounts done.
    Attached Thumbnails Attached Thumbnails L-X-done-IMGP1692.jpg   R-X-done-IMGP1718.jpg   Y-and-Z-done-IMGP1564.jpg  

  17. #17
    Join Date
    Jun 2004
    Posts
    48
    I thought I would be able to use the feedback encoders on the servos as a DRO in manual mode until I found out they were resolvers. So I decided I had to have a DRO so I bought a 3 axis Newall C80 for X, Y, and Knee. I also pondered home and limit switches and decided on the Industrial Hobbies optical limit switches.

    So I took a little detour to install the DRO and installed the home/ limit switches at the same time. The home/ limit is shared at -X, +Y, and +Z.
    Attached Thumbnails Attached Thumbnails X-limit-mount-IMG_0423.jpg   X-limit-done-IMG_0443.jpg   Y-limit-and-scale-done-IMG_.jpg   Z-limit-and-scale-IMG_0460.jpg  


  18. #18
    Join Date
    Feb 2006
    Posts
    1187
    Nice work RJ, I,m impressed. Hey you said that your a beginning machinist/hobbyist right? How come such a large mill?(not that theres anything wrong with that Bigger is better)

  19. #19
    Join Date
    Jun 2004
    Posts
    48
    Hi ZipSnipe,

    When I was in high school, I bought a Taig micro lathe. I got so frustrated with problems keeping the work tight in the chuck, chatter, and shallow depth of cut due to lack of rigidity and mass. When I took my class at De Anza College, I used a Bridgeport knee mill and 13x40 lathes. I was amazed how easy it was to take off metal with no complaint from the machine.

    Originally I was going to get something like a 9x20 lathe and 8x30 or 8x36 knee mill; but after taking the class, I just decided to go for a standard size knee mill and 12x36 lathe. Everybody always says more mass is better. Besides, it's my mid-life crisis, right?

    Regards,
    Rick

  20. #20
    Join Date
    Mar 2005
    Posts
    1136
    Rick, nice work, thanks for sharing so many pics. you will congratulate yourself for years to come on what a clever chap you were in going for a full size mill

Page 1 of 3 123

Similar Threads

  1. Sharp retrofit CNC mill problems
    By Stephen Samuels in forum Vertical Mill, Lathe Project Log
    Replies: 0
    Last Post: 06-18-2014, 11:02 PM
  2. Sharp retrofit CNC mill problems
    By Stephen Samuels in forum Other Machine Topics
    Replies: 0
    Last Post: 06-18-2014, 10:55 PM
  3. Sharp retrofit CNC mill problems
    By Stephen Samuels in forum Sharp CNC
    Replies: 0
    Last Post: 06-18-2014, 10:47 PM
  4. So I upgraded my Sharp/YC mill to 30 taper...
    By cmjohnson in forum Knee Vertical Mills
    Replies: 2
    Last Post: 01-25-2010, 01:26 AM
  5. How to make a sharp corner on a mill?
    By zaebis in forum MetalWork Discussion
    Replies: 14
    Last Post: 09-02-2009, 07:57 PM

Tags for this Thread

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •