    Hello Friends,


    Now we are facing a problem:

    While we were milling a part, the z-axis suddenly took deep cut and spoilt the part and then the connection of the lead screw with the handwheel was gone when we checked. So we opened the assembly and found out that part no. 67105 (CNC COUPLING) was broken. Now I needed to replace this part.

    I want to understand why this part broke and does this part breaks often, so I can keep a few in my inventory?


    The sudden z axis cut was about 1mm.

    I will tell you what we were doing and what exactly happened so you get a better idea on what might have happened:

    We are doing a part production for which we designed the part and generated the code. We were using 5mm end mill cutter ( 2 flute as well as 4 flute). the maximum cut size was 0.75mm. Material is brass and the spindle speed = 2500 rpm with feed rate of 250. For making this perticular part, we need to use 3 tools. 1st 5mm tool for roughing and finishing, then 3mm tool for further finishing and finally 1 mm end mill cutter for final finishing. While using the 5 mm end mill cutter, there are always vibrations and a bit too loud noise, compared to 3mm and 1mm cutters. but we successfully produced about 25 parts.

    Then because of the vibrations while using 5mm end mill (though the material to be removed was very less because we turn the blank first so that the cutter has to remove minimum material), I reduced the maximum cut size to be 0.375 mm. Vibrations were still there but little lesser. Thus we successfully made about 25 parts and then one day evening while we were doing last part of the day ( 8 nos. already finished during the day) using 5mm cutter, it suddenly took a deep cut, so we stopped the machine at the end of the 5mm cutter program. Then we tried to take the z-axis up, we noticed that the connection between the handwheel and the leadscrew is not there and by rotating the handwheel the axis is not going up.

    It is then we opened the assembly and came to understand that the part is broken.

    I guess this should give you fairly a good idea on what we were doing and what exactly happened. Kindly guide us on this, so we understand sherline machine in a better manner.

    Sometimes, z-axis used to move a bit too tightly. Kindly also guide us on exactly how to keep is smooth moving like x and y axes.

    We are planning to use the machine for about 9-10 hours of operation per day. I hope that's not a problem?

    After I got the new part from sherline dealer:

    We removed the broken part from the motor shaft which a bit too tight fitted. After removing the same, we noticed that there were some marks and burrs on the shaft which we cleaned by using a very find sand paper lightly, taking care that we do not alter the diameter of the shaft. Then we slide in the new part, which slide in easily. Fitted in the screw and done the whole assembly for the z-axis.

    Then we dis not know what to do next, so we well lubricated all the 3 axes and made sure that z-axis is moving smoothly up and down and then did a work piece but almost at the end of the program, the z-axis again took a little deep cut than desired at some points and then the program stopped at the end of the program.
    When we investigated the matter, we found out that the lead screw was disengaged from the top. we engaged it again but now the up and down movement of the saddle was little tight, so we tried to adjust the saddle screw and the 2 small screws at the side. We stopped at this stage because I do not intend to again break the same or any other part or harm the machine in any way, so I am seeking your help and guidance.

    What I could understand is as below. Please let me know if my understanding is correct or not:

    The main saddle screw is provided to engage the spindle with the saddle but as it may put load on saddle and in turn on leadscrew, the 2 small screws are provided, so by adjusting the same, the load can be balanced and the lead screw can be kept straight. The up down movement is to be adjusted using the lock which is provided just above the saddle. Is this correct?
    I want to understand what causes the lead screw to disengage from the top and what can we do to prevent the same. How to run the machine in correct manner so as to get best from the machine?

    I tried to search in the book and on sherline website and also on google on this but could not find much help.

    You may please write to me on my email address at [email protected].

    Thank you all,
    Pramod Agrawal.

  2. #2
    Join Date
    Dec 2009
    Posts
    4
    Quote Originally Posted by pramodisha View Post
    Hello Friends,


    Now we are facing a problem:

    While we were milling a part, the z-axis suddenly took deep cut and spoilt the part and then the connection of the lead screw with the handwheel was gone when we checked. So we opened the assembly and found out that part no. 67105 (CNC COUPLING) was broken. Now I needed to replace this part.

    I want to understand why this part broke and does this part breaks often, so I can keep a few in my inventory?


    The sudden z axis cut was about 1mm.

    I will tell you what we were doing and what exactly happened so you get a better idea on what might have happened:

    We are doing a part production for which we designed the part and generated the code. We were using 5mm end mill cutter ( 2 flute as well as 4 flute). the maximum cut size was 0.75mm. Material is brass and the spindle speed = 2500 rpm with feed rate of 250. For making this perticular part, we need to use 3 tools. 1st 5mm tool for roughing and finishing, then 3mm tool for further finishing and finally 1 mm end mill cutter for final finishing. While using the 5 mm end mill cutter, there are always vibrations and a bit too loud noise, compared to 3mm and 1mm cutters. but we successfully produced about 25 parts.

    Then because of the vibrations while using 5mm end mill (though the material to be removed was very less because we turn the blank first so that the cutter has to remove minimum material), I reduced the maximum cut size to be 0.375 mm. Vibrations were still there but little lesser. Thus we successfully made about 25 parts and then one day evening while we were doing last part of the day ( 8 nos. already finished during the day) using 5mm cutter, it suddenly took a deep cut, so we stopped the machine at the end of the 5mm cutter program. Then we tried to take the z-axis up, we noticed that the connection between the handwheel and the leadscrew is not there and by rotating the handwheel the axis is not going up.

    It is then we opened the assembly and came to understand that the part is broken.

    I guess this should give you fairly a good idea on what we were doing and what exactly happened. Kindly guide us on this, so we understand sherline machine in a better manner.

    Sometimes, z-axis used to move a bit too tightly. Kindly also guide us on exactly how to keep is smooth moving like x and y axes.

    We are planning to use the machine for about 9-10 hours of operation per day. I hope that's not a problem?

    After I got the new part from sherline dealer:

    We removed the broken part from the motor shaft which a bit too tight fitted. After removing the same, we noticed that there were some marks and burrs on the shaft which we cleaned by using a very find sand paper lightly, taking care that we do not alter the diameter of the shaft. Then we slide in the new part, which slide in easily. Fitted in the screw and done the whole assembly for the z-axis.

    Then we dis not know what to do next, so we well lubricated all the 3 axes and made sure that z-axis is moving smoothly up and down and then did a work piece but almost at the end of the program, the z-axis again took a little deep cut than desired at some points and then the program stopped at the end of the program.
    When we investigated the matter, we found out that the lead screw was disengaged from the top. we engaged it again but now the up and down movement of the saddle was little tight, so we tried to adjust the saddle screw and the 2 small screws at the side. We stopped at this stage because I do not intend to again break the same or any other part or harm the machine in any way, so I am seeking your help and guidance.

    What I could understand is as below. Please let me know if my understanding is correct or not:

    The main saddle screw is provided to engage the spindle with the saddle but as it may put load on saddle and in turn on leadscrew, the 2 small screws are provided, so by adjusting the same, the load can be balanced and the lead screw can be kept straight. The up down movement is to be adjusted using the lock which is provided just above the saddle. Is this correct?
    I want to understand what causes the lead screw to disengage from the top and what can we do to prevent the same. How to run the machine in correct manner so as to get best from the machine?

    I tried to search in the book and on sherline website and also on google on this but could not find much help.

    You may please write to me on my email address at [email protected].

    Thank you all,
    Pramod Agrawal.
    Don't worry,, this has happened to me.
    Soon I'll put a video teaching how to make a 67105 (CNC COUPLING) coupling with detail.
    The result is perfect.
    Regards
    Luiz Ally
    Tryally (Youtube)

  3. #3
    Join Date
    Nov 2009
    Posts
    4415
    You got an answer from the Sherline legend himself! Luiz, where have you been hiding? We miss your videos!

  4. #4
    Join Date
    Aug 2010
    Posts
    0
    Dear Luiz,

    Thanks a lot for your reply to my post.
    I am facing several other issues also.

    Can I write those to you? Would you please help me with the issues that I am having with my sherline mill?

    Thanks once again,
    Pramod.

  5. #5
    Join Date
    Apr 2004
    Posts
    5728

    Brass is tricky and sticky

    It does have a tendency to catch the tool, especially if you're trying to take a heavy cut. Normal endmills are typically sharpened for aluminum or steel, not brass. Brass requires a more obtuse angle on the cutting edge to cut well and not "hook" the material. See if you can find tooling specifically designed for brass.

    Andrew Werby
    ComputerSculpture.com — Home Page for Discount Hardware & Software

  6. #6
    Join Date
    Aug 2010
    Posts
    0
    Dear Andrew,
    Thanks for your reply. I will search and see if I can find cutters specially designed to cut brass.:-)
    Thanks once again.
    Pramod.

  7. #7
    Join Date
    Aug 2008
    Posts
    292

    light and heavy duty

    i like Sherline tools very much for certain small jobs but

    1) Sherline models are not very rigid especially on brass where a cutter can grab and try to pull it self in.

    2) using a light duty machine for 10 hour a day work is not recommended. i have easily used my machine maybe a average of 10 hours a month and after over 5 years have only has to replace a few minor parts. Trying to use for 10 hours a day i would guess in less than a month you will have machine parts wearing out.

    it is a good "hobby" machine at a hobby machine price. a heavy duty machine for 24 hour a day 7 days a week service would probably cost 10 times more and would have more parts for long term use. for example the ways would be hardened steel and chrome plated and the saddle and slides would not be made of aluminum. the lead screws and nut would be heavier to with stand heavy duty use.

  8. #8
    Join Date
    Oct 2010
    Posts
    448
    Hey Luiz, a company in Clearwater/Largo FLorida is making an ISO15 conversion kit for the Sherline 30100 headstock (standard mill head).

    I'm digging out my mill over the weekend and prepping it for one so I can see how much better this is over that quick change that wasn't worth the time to install and only wasted my money.

    The basic kit consists of the complete ISO15 shaft assembly in the $200.00 to $250.00 range and I'm told can be installed in about 30 minutes.

Similar Threads

  1. Awesome base for Sherline 2000 Mill -- Free to a good home
    By carllance in forum Benchtop Machines
    Replies: 1
    Last Post: 12-23-2011, 06:42 PM
  2. Replies: 9
    Last Post: 10-08-2011, 09:32 PM
  3. CAD CAM recommendations for Sherline 2000 mill
    By rwsduc in forum Uncategorised CAM Discussion
    Replies: 5
    Last Post: 03-10-2011, 10:07 PM
  4. I have $2000.00 to invest (mini Mill)
    By jeffrey001 in forum MetalWork Discussion
    Replies: 15
    Last Post: 07-22-2009, 04:32 AM
  5. CAM Programming helps a new begynner with the Sherline Mill 2000 (2010)
    By AlfSkaar in forum Uncategorised CAM Discussion
    Replies: 8
    Last Post: 09-03-2007, 02:39 PM

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •