Once the first rail was installed we started working on the second rail, we used a large piece of 4” angle iron and fixed the 2 bearing blocks to it, then rode it up and down to get the rails parallel. Once the rails are parallel each hole is drilled and tapped one at a time, then a cap screw is installed and the next hole is punched, rail removed, hole drilled, hole tapped, rail put back in place, cap screw fastened then repeat for the next 30 holes. Once all of the holes were drilled, we repeated the leveling process with the jacking screws.
Attachment 211622 Attachment 211628 Attachment 211630 Attachment 211632 Attachment 211634 Attachment 211636 Attachment 211638 Attachment 211642