585,981 active members*
4,470 visitors online*
Register for free
Login
IndustryArena Forum > MetalWorking Machines > Novakon > Torus Pro As A "Production" Machine
Page 2 of 73 12341252
Results 21 to 40 of 1459
  1. #21
    Join Date
    Mar 2013
    Posts
    15
    Thanks for posting this thread very informative and lots to think about.
    Forrey.

  2. #22
    Join Date
    Jun 2008
    Posts
    1082
    While driving around I found a guy who parked his semi-trailer in a parking lot by a fast food restaurant who said he'd give me 50¢ per pound for aluminum chips. I asked him whether coolant or the possibility of small amounts of other metal mixed in mattered and he said it didn't.

    Before I actually take my few gallons of chips over I think I'll call every recycling center in town to see if anyone can offer something better.

  3. #23
    Join Date
    Jun 2004
    Posts
    6618
    Those guys usually have things that shred cans and collect the steel, drop any heavy debris like glass, rocks and water and blow the aluminum into the truck. Whatever is collected is then deducted from the initial weight and weight is adjusted for #2 or #3 aluminum. Usually discounted quite a bit for chips.
    That keeps people from loading up cans with garbage and getting paid for it.
    Lee

  4. #24
    Join Date
    Feb 2006
    Posts
    7063
    The spindle on this machine is really a thing of beauty. My old machine is a 9x49 knee mill that claims to have a 3HP spindle. Based on performance, I'd guess its really more like half that. The Torus Pro will do things, without even straining that would stall the old machine. This AM I drilled 12 5/8" holes through 2" thick 6061, and did out in one shot, no pecking. Easy as pie.

    Regards,
    Ray L.

  5. #25
    Join Date
    Feb 2006
    Posts
    7063
    Another good day today - Made a few more parts for my ignition kits. These are part of the bracket that mounts the VR pickup to the timing cover, so it lines up with the crank-mounted trigger wheel:

    I went a bit more aggressive as well - 0.3" DOC, with the same 20 IPM feedrate. The machine handled it with no problem whatsoever.

    Two 1-1/4" x 2-1/2" x 19" blanks mounted on fixture:

    Click image for larger version. 

Name:	IMG_20130420_110924_697.jpg 
Views:	3 
Size:	81.2 KB 
ID:	182112

    Bottom side machining complete:

    Click image for larger version. 

Name:	IMG_20130420_124036_752.jpg 
Views:	2 
Size:	123.8 KB 
ID:	182113

    Turned over, ready for top side machining:

    Click image for larger version. 

Name:	IMG_20130420_131359_992.jpg 
Views:	2 
Size:	90.8 KB 
ID:	182115

    And the finished parts:

    Click image for larger version. 

Name:	IMG_20130420_165159_200.jpg 
Views:	2 
Size:	62.4 KB 
ID:	182116 Click image for larger version. 

Name:	IMG_20130420_164934_698.jpg 
Views:	0 
Size:	40.9 KB 
ID:	182117 Click image for larger version. 

Name:	IMG_20130420_164921_559.jpg 
Views:	0 
Size:	56.0 KB 
ID:	182118

    The machine was a mess afterwards:

    Click image for larger version. 

Name:	IMG_20130420_165320_338.jpg 
Views:	2 
Size:	112.7 KB 
ID:	182120

    And this is why I don't do videos - I'd end up taking a shower, and getting the whole shop wet, plus losing a lot of coolant.

    Click image for larger version. 

Name:	IMG_20130420_123528_291.jpg 
Views:	2 
Size:	84.4 KB 
ID:	182119

    Regards,
    Ray L.

  6. #26
    Join Date
    Jun 2004
    Posts
    6618
    Very nice. Great looking parts there.
    Lee

  7. #27
    Join Date
    Feb 2006
    Posts
    7063
    I've learned it really pays to stop about once an hour, and spend a few minutes clearing the chips off the bellows and the table, and pushing as much as possible down the drain. This keeps the accumulation from getting quite so out of control, and makes cleanup at the end of the day much easier. And, since this machine will quite reliably crank out 3-4 gallons of chips PER HOUR when doing a lot of heavy roughing, I need to stop about that often to empty the chip bucket anyway.

    The 3" drain is still inadequate - it can be quite difficult to shove the large clumps of chips down it, especially when they contain either longer "strings" from drilling, or the nice "aluminum wool" created by face milling and deep peripheral finishing. What I'd like to do is just cut a couple of large, rectangular holes - probably about 6" x 12" - on either side of the base, and have them dump into two large rectangular plastic boxes, similar to my coolant reservoir.

    Regards,
    Ray L.

  8. #28
    Join Date
    Jul 2007
    Posts
    675
    Quote Originally Posted by HimyKabibble View Post
    I've learned it really pays to stop about once an hour, and spend a few minutes clearing the chips off the bellows and the table, and pushing as much as possible down the drain. This keeps the accumulation from getting quite so out of control, and makes cleanup at the end of the day much easier. And, since this machine will quite reliably crank out 3-4 gallons of chips PER HOUR when doing a lot of heavy roughing, I need to stop about that often to empty the chip bucket anyway.

    The 3" drain is still inadequate - it can be quite difficult to shove the large clumps of chips down it, especially when they contain either longer "strings" from drilling, or the nice "aluminum wool" created by face milling and deep peripheral finishing. What I'd like to do is just cut a couple of large, rectangular holes - probably about 6" x 12" - on either side of the base, and have them dump into two large rectangular plastic boxes, similar to my coolant reservoir.

    Regards,
    Ray L.
    +1. That's why I replaced the original with two 4" drains. Probably should have went 5-6" now that I think about it. The Pro is definetetly good at making gallons of chips.

  9. #29
    Join Date
    Feb 2006
    Posts
    7063
    I am just LOVING this machine! It has been 100% reliable, to the point I have no problem walking away and leaving it running unattended whenever I need to. I've cranked out a TON of parts over the last week, and it has not so much as hiccuped once, and the parts are coming out just beautiful, and right on dimension. The consistency is just wonderful.

    My next problem is figuring out how to get rid of the mountain of chips I'm creating....

    Regards,
    Ray L.

  10. #30
    Join Date
    Jun 2007
    Posts
    3757
    Make a screw chip conveyor. Rather simple screw something like this or simpler.
    Google Image Result for http://www.uniimag.com/images/products/Screw%2520conveyors%2520.png
    Super X3. 3600rpm. Sheridan 6"x24" Lathe + more. Three ways to fix things: The right way, the other way, and maybe your way, which is possibly a faster wrong way.

  11. #31
    Join Date
    Jul 2007
    Posts
    675
    Quote Originally Posted by neilw20 View Post
    Make a screw chip conveyor. Rather simple screw something like this or simpler.
    Google Image Result for http://www.uniimag.com/images/products/Screw%2520conveyors%2520.png
    I doubt Ray could put his new toy down long enough to do that.

  12. #32
    Join Date
    Jun 2007
    Posts
    3757
    He'll be OK. I'm sure he works night too.

  13. #33
    Join Date
    Jan 2007
    Posts
    869
    I go to a metal recyclers. If I keep my 6061 chips separate, I get $0.60 a pound.

    I get more for larger chunks, something like almost $0.95/lb.

    Wade

  14. #34
    Join Date
    Feb 2006
    Posts
    7063
    Quote Originally Posted by wwendorf View Post
    I go to a metal recyclers. If I keep my 6061 chips separate, I get $0.60 a pound.

    I get more for larger chunks, something like almost $0.95/lb.

    Wade
    I wish I could get that kind of money for them. The only recycler in this area that will take chips at all only gives us ten cents per pound.

    Regards,
    Ray L.

  15. #35
    Join Date
    Jan 2007
    Posts
    869
    Dang, that sucks! My recycler even gives me a nice calendar with a bikini girl on it to hang in my shop every year. <GRIN>

    Wade

  16. #36
    Join Date
    Jun 2007
    Posts
    3757
    Ray, You need a better recycler. He's giving you mixed scrap prices. He's scared there might be other stuff in the chips. Probably been caught before.

  17. #37
    Join Date
    Jan 2007
    Posts
    869
    That's true, but I still get $0.25/lb for mixed. The guy is really cheaping you out.

    Wade

  18. #38
    Join Date
    Jun 2007
    Posts
    3891
    Quote Originally Posted by wwendorf View Post
    I go to a metal recyclers. If I keep my 6061 chips separate, I get $0.60 a pound.

    I get more for larger chunks, something like almost $0.95/lb.

    Wade
    i PAY only about $2ish a pound for new 6061 stock. for chips, unless you have vast amounts, you have to pay to get rid of them. for large chunks, youre lucky if you get 50 cents.

  19. #39
    Join Date
    Jan 2007
    Posts
    869
    I'm in the upper midwest, our aluminum stock cost is about $2.50-$3.25 / lb. I've never had to pay to get rid of chips.

    Wade

  20. #40
    Join Date
    Jun 2007
    Posts
    3891
    Quote Originally Posted by wwendorf View Post
    I'm in the upper midwest, our aluminum stock cost is about $2.50-$3.25 / lb. I've never had to pay to get rid of chips.

    Wade
    yeah, i suppose its all dependent where you are. we have 2 of north americas biggest extruding plants here in the city, along with a few small ones. noones interested in chips or paying much for scrap from small shops.

Page 2 of 73 12341252

Similar Threads

  1. Replies: 5
    Last Post: 01-12-2014, 07:07 PM
  2. Need advice Setting Up production: 4 to 8 sq ft of 39" long 1x1" AL Angle daily use
    By aluminumwelder in forum Material Machining Solutions
    Replies: 1
    Last Post: 09-27-2013, 08:21 AM
  3. First "real parts" made on the Torus Pro
    By AUSTINMACHINING in forum Novakon
    Replies: 2
    Last Post: 05-30-2013, 04:06 AM
  4. X Axis "Goes Off Pattern", "Awry", "Skewed", "Travels"
    By DaDaDaddio in forum Laser Engraving / Cutting Machine General Topics
    Replies: 1
    Last Post: 05-06-2013, 09:59 AM
  5. Thread Milling using "C" axis no "Y" on the machine
    By tejano4life72 in forum Mori Seiki lathes
    Replies: 7
    Last Post: 07-19-2010, 08:59 PM

Tags for this Thread

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •