585,931 active members*
5,161 visitors online*
Register for free
Login
IndustryArena Forum > MetalWorking Machines > Daewoo/Doosan > Work Transfer Doosan - Puma TT 2000 SY
Results 1 to 4 of 4
  1. #1
    Join Date
    Sep 2014
    Posts
    7

    Work Transfer Doosan - Puma TT 2000 SY

    Hi,
    i need to trasnfer workpiece on TT2000SY (fanuc 18i) from one spindle to the second spindle with "overload stop" in manual its called "torque skip".
    I can trasfer it. But i really need that overload. In manual is this :
    M131 ; Rotate right spindle under the unclamp state of right chuck.
    M169 ; Unclamp right chuck.
    M203S_ ; Synchronizing left spindle and right spindle, rotate to CW direction.
    G00 A_. ; Move right spindle to the front of left spindle using A-axis.
    M86 ; Activate the torque skip function.
    G31 P98 A_. F_ ; A-axis is moved by the commanded feed, left spindle and right
    spindle is adhered, and if A-axis is carried the load (torque) more
    than the setting value, stops the movement of A-axis and executes
    the next block

    M87 ; Make the torque skip function unavailable.
    M168 ; Clamp right chuck.
    M31 ; Left chuck can be unclamped during the rotation of left spindle.
    M69 ; Unclamp left chuck.
    G00 A_. ; Move A-axis for next cutting.

    I tried it but it didnt stop on that "overload". In manual there is a note: It is normal to programming move 2-4mm behind "adhere point". I tried move it 0.3 behind and it wont stop.. Im afraid go far.. for example 2mm.. i dont want crash it..
    So does have anyone some experience with it and can help me? it is very important :X

    thanks for response

    P.S.: sorry for my bad english

  2. #2
    Join Date
    Jul 2005
    Posts
    380

    Re: Work Transfer Doosan - Puma TT 2000 SY

    Hi

    What's the serial # on the machine?
    I can help.

  3. #3
    Join Date
    Jul 2005
    Posts
    380

    Re: Work Transfer Doosan - Puma TT 2000 SY

    Make sure there is a "M86" Torque Skip command function activation on a line by itself BEFORE the G31 and a "M87" Torque Skip Command Cancel on a line by itself AFTER the part hand off. This should help.

  4. #4
    Join Date
    Sep 2014
    Posts
    7

    Re: Work Transfer Doosan - Puma TT 2000 SY

    Its working thanks for answer.. i programmed 3mm behind and it stops cca 0.4 - 0.6 behind adhere point.. i can even watch % overload of axis..

Similar Threads

  1. Need help with my doosan puma 400 m
    By gongo999 in forum Daewoo/Doosan
    Replies: 2
    Last Post: 12-06-2014, 02:15 PM
  2. Help with doosan puma 300 lb
    By mattlynx in forum Daewoo/Doosan
    Replies: 11
    Last Post: 12-04-2013, 09:56 PM
  3. Doosan Puma 400L
    By Bada Bing in forum Daewoo/Doosan
    Replies: 2
    Last Post: 06-05-2013, 12:43 AM
  4. Doosan Puma 2100SY
    By Mikey4865 in forum Daewoo/Doosan
    Replies: 13
    Last Post: 01-29-2013, 08:37 PM
  5. Doosan - Puma 240S
    By dartplayer1 in forum Daewoo/Doosan
    Replies: 2
    Last Post: 09-25-2012, 12:50 PM

Tags for this Thread

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •