Originally Posted by
DMoneyAllstar
My water table warped maybe 1/8" overall after welding. I c-clamped it to the table when I welded the water table to the main table. And when welding the sheet to frame, I tacked every 6" beforehand and then welded in 4-5" beads bouncing around the table around to keep things cool.
Same deal...my electronics arrived yesterday, my 100gal oil tank needs cleaned and welded, and putting in my air line system this weekend. Sweating-in about 150' of copper should be FUN. Not.
And I've also got a couple people asking me when I can cut like every 2-3 days, lol.
Go, go, go man!