Hello,

We have a Trump Trumatic 3030 laser and a Trump Trulaser 5030.

The 3030 is Bosch controlled and the 5030 is Siemens controlled.

On the 5030 I can set up a production plan and run sheets continuously with auto sheet load, etc. I'm wondering if I can set up my 3030 to do the same.

I've inserted M610 into my program code to do a sheet swap and start with the push of the cycle start button but would like to have it restart the program automatically at the end of the program. My theory is that I can set up both pallets and run 2 sheets without human intervention. The program wouldn't start a 3rd time because the pallet changer wouldn't have been unloaded or acknowledge.

Is it as simple as adding "N1150GOTON10" or something like that? Currently using M02 as the end of program callout.