For a 4 axis XYZ router, Nema 23 steppers, Bosch 120V router... what size drag chains would you recommend for the travel, gantry, and Z axis? Assume shielded continuous flex cable.

Can the 120V AC run with the stepper power and limit switches or should all three run separate?