    CNC Construction Set Build 3 Blog

    First a little history.

    CNC Construction Set Build 1
    Build 1 consisted of several iterations of the early prototype. The plate material used was Corian. The Corian was very easy to cut and drill with standard woodworking tools. Corian can be a little pricey if you cant locate any locally. While I did develop some interchangeable Z carriages, this machine is primarily set up as a plasma CNC.

    Shown here it has a floating head IHS and a steel angle cutting fixture.
    Attachment 417100

    CNC Construction Set Build 2
    Build 2 used PVC as the plate material. While this was very easy to cut and drill, it is not as rigid as the build using the Corian plates. This machine I am currently using for milling and to test my rotary axis.

    Shown here, build 2 has many upgrades added that I will eventually be documenting.
    Attachment 416896

    In this blog, I will be covering build 3.
    Very happy with the build so far, I decided to start a third build, using MDF. Since this plate material is listed in the book I needed to try it out. I will also be doing the advanced electronics option on this build since it will also support CNC operations.

    If you would like some more information covering the CNC Construction Set builds, you can get it here:
    https://www.kronosrobotics.com/cnccsintro
    Author of: The KRMx01 CNC Books, The KRMx02 CNC Books, The KRmc01 CNC Milling Machine Books, and Building the HANS Electric Gear Clock. All available at www.kronosrobotics.com

  2. #2
    Join Date
    Aug 2010
    Posts
    686

    Re: CNC Construction Set Build 3 Blog

    Volume 1 - Chapter 1 - Getting Started


    The Stand

    The stand I am using for the CNC Construction Set is a readily available steel stand.

    Shown here are the parts as they arrive from Rockler.
    Attachment 416898

    It took me about an hour to assemble the stand.
    Attachment 416900

    I did add some white peg board as a lower shelf so I would have a place to put my PC and electronics.
    Attachment 416902
    Attachment 416904

    One thing I added as an option were these heavy duty leveling castors.
    Attachment 416906
    Attachment 416908
    Author of: The KRMx01 CNC Books, The KRMx02 CNC Books, The KRmc01 CNC Milling Machine Books, and Building the HANS Electric Gear Clock. All available at www.kronosrobotics.com

  3. #3
    Join Date
    Aug 2010
    Posts
    686

    Re: CNC Construction Set Build 3 Blog

    Volume 1 - Chapter 2 - The Frame

    I gathered all my components and assembled the angle brackets.
    Attachment 416912
    Attachment 416910

    Brackets were installed on the lower three slots of the short frame components.
    Attachment 416914

    I then finished the frame assembly.
    Attachment 416916

    I marked the location for the frame mounting hardware using a light blue pencil.
    Attachment 416918

    Finished Frame/Stand Assembly.
    Click image for larger version. 

Name:	_MG_1457.jpg 
Views:	0 
Size:	142.6 KB 
ID:	416920
    Author of: The KRMx01 CNC Books, The KRMx02 CNC Books, The KRmc01 CNC Milling Machine Books, and Building the HANS Electric Gear Clock. All available at www.kronosrobotics.com

  4. #4
    Join Date
    Aug 2010
    Posts
    686

    Re: CNC Construction Set Build 3 Blog

    Volume 1 - Chapter 3 - Y Rails

    I received the replacement Y-rails today. So I was able to finish the Y-rails chapter. It went smoothly. I did make a few small changes to the book but nothing significant.
    Attachment 416922
    Attachment 416924

    Be sure to give the shafts a good soaking in oil, then wipe them with a paper towel.
    Click image for larger version. 

Name:	_MG_1503.jpg 
Views:	0 
Size:	71.8 KB 
ID:	416926
    Author of: The KRMx01 CNC Books, The KRMx02 CNC Books, The KRmc01 CNC Milling Machine Books, and Building the HANS Electric Gear Clock. All available at www.kronosrobotics.com

  5. #5
    Join Date
    Aug 2010
    Posts
    686

    Re: CNC Construction Set Build 3 Blog

    Volume 1 - Chapter 4 - Y Carriages

    I finished the Y-carriages.
    Attachment 416928
    Attachment 416930
    Click image for larger version. 

Name:	_MG_1508.jpg 
Views:	0 
Size:	100.1 KB 
ID:	416932

    The only glitch I had was one of the holes used to mount the plate to the truck was off. To fix, I just enlarged the hole a little. This just shows you that even if you are using a template, if you don't place you punch correctly, your hole will be off. I was moving a little too fast and needed to slow down a little.
    Author of: The KRMx01 CNC Books, The KRMx02 CNC Books, The KRmc01 CNC Milling Machine Books, and Building the HANS Electric Gear Clock. All available at www.kronosrobotics.com

  6. #6
    Join Date
    Aug 2010
    Posts
    686

    Re: CNC Construction Set Build 3 Blog

    Volume 1 - Chapter 5 - X Rails

    Finished the X-rails.
    Click image for larger version. 

Name:	_MG_1510.jpg 
Views:	0 
Size:	49.3 KB 
ID:	416934
    Author of: The KRMx01 CNC Books, The KRMx02 CNC Books, The KRmc01 CNC Milling Machine Books, and Building the HANS Electric Gear Clock. All available at www.kronosrobotics.com

  7. #7
    Join Date
    Aug 2010
    Posts
    686

    Re: CNC Construction Set Build 3 Blog

    Volume 1 - Chapter 6 - Gantry

    I attached the templates to my riser plates and marked the holes and cutout.
    Attachment 416936

    The gantry attached to the risers.
    Attachment 416938

    The left risers look a little skewed. This can be caused by the plates not square with the gantry beam or the frame is not exactly square. Not an issue as it will be corrected in the tuning phase. However it is important that the riser blocks are not sticking past the extrusion or it may cause some issues later.
    Attachment 416940

    Here is some cleanup I had to do later because they were sticking out. It would have been easier to fix the mount now the wait till later and have to use a hand plane like I did.
    Click image for larger version. 

Name:	_MG_1599.jpg 
Views:	0 
Size:	90.5 KB 
ID:	416942
    Author of: The KRMx01 CNC Books, The KRMx02 CNC Books, The KRmc01 CNC Milling Machine Books, and Building the HANS Electric Gear Clock. All available at www.kronosrobotics.com

  8. #8
    Join Date
    Aug 2010
    Posts
    686

    Re: CNC Construction Set Build 3 Blog

    Volume 1 - Chapter 7 - Gantry Brace

    I attached the templates to the gantry 1" angle. In my case using MDF the gantry braces were exactly 10".
    Attachment 416946
    Click image for larger version. 

Name:	_MG_1531.jpg 
Views:	0 
Size:	78.9 KB 
ID:	416948
    Author of: The KRMx01 CNC Books, The KRMx02 CNC Books, The KRmc01 CNC Milling Machine Books, and Building the HANS Electric Gear Clock. All available at www.kronosrobotics.com

  9. #9
    Join Date
    Aug 2010
    Posts
    686

    Re: CNC Construction Set Build 3 Blog

    Volume 1 - Chapter 8 - X Carriage

    I attached the template to the plate stock
    Attachment 416958

    The mounted carriage
    Attachment 416960
    Author of: The KRMx01 CNC Books, The KRMx02 CNC Books, The KRmc01 CNC Milling Machine Books, and Building the HANS Electric Gear Clock. All available at www.kronosrobotics.com

  10. #10
    Join Date
    Aug 2010
    Posts
    686

    Re: CNC Construction Set Build 3 Blog

    Volume 1 - Chapter 9 - Z Rails

    I cut my Z rails
    Attachment 416962

    And mounted them on the X carriage.
    Attachment 416964
    Author of: The KRMx01 CNC Books, The KRMx02 CNC Books, The KRmc01 CNC Milling Machine Books, and Building the HANS Electric Gear Clock. All available at www.kronosrobotics.com

  11. #11
    Join Date
    Aug 2010
    Posts
    686

    Re: CNC Construction Set Build 3 Blog

    Volume 1 - Chapter 10 - Z Carriage

    I marked my Z carriages and risers using the templates.
    Attachment 416966

    Starting to come together.
    Attachment 416968

    This concludes Volume 1.
    Author of: The KRMx01 CNC Books, The KRMx02 CNC Books, The KRmc01 CNC Milling Machine Books, and Building the HANS Electric Gear Clock. All available at www.kronosrobotics.com

  12. #12
    Join Date
    Aug 2010
    Posts
    686

    Re: CNC Construction Set Build 3 Blog

    Volume 2 - Chapter 2 - Tuning the Gantry

    I built the gauge block. (covered in the book)
    Attachment 416970

    I did have to make a little adjustment to the lower rail. But it only took a couple minutes and it turned out perfect.
    Attachment 416972
    Click image for larger version. 

Name:	_MG_1545.jpg 
Views:	0 
Size:	79.4 KB 
ID:	416974
    Author of: The KRMx01 CNC Books, The KRMx02 CNC Books, The KRmc01 CNC Milling Machine Books, and Building the HANS Electric Gear Clock. All available at www.kronosrobotics.com

  13. #13
    Join Date
    Aug 2010
    Posts
    686

    Re: CNC Construction Set Build 3 Blog

    Volume 2 - Chapter 3 - Work Table

    Nuf Said ...
    Attachment 416976
    Author of: The KRMx01 CNC Books, The KRMx02 CNC Books, The KRmc01 CNC Milling Machine Books, and Building the HANS Electric Gear Clock. All available at www.kronosrobotics.com

  14. #14
    Join Date
    Aug 2010
    Posts
    686

    Re: CNC Construction Set Build 3 Blog

    Volume 2 - Chapter 4 - Tuning the Z-carriage

    The X and Z carriage are now square and tuned.
    Attachment 416978

    I did notice a few things. The trucks I used on the Z carriage had preloaded grub screws on the sides as well as the top. This may vary even from the same manufacture, but the procedure is the same. Tighten the grub screws until there is no play in the truck on the rail. If it does not slide smoothly, back it off a little.
    Author of: The KRMx01 CNC Books, The KRMx02 CNC Books, The KRmc01 CNC Milling Machine Books, and Building the HANS Electric Gear Clock. All available at www.kronosrobotics.com

  15. #15
    Join Date
    Aug 2010
    Posts
    686

    Re: CNC Construction Set Build 3 Blog

    Volume 2 - Chapter 5 - Pen Holder

    I used the optional templates to mark my holes and cutouts.
    Attachment 416980
    Attachment 416982

    I drilled the tool holder holes.
    Attachment 416984

    This is the optional pen holder. I drilled all the holes before I made the two corner cutouts.
    Attachment 416986

    Simple pen holder installed.
    Attachment 416988
    Author of: The KRMx01 CNC Books, The KRMx02 CNC Books, The KRmc01 CNC Milling Machine Books, and Building the HANS Electric Gear Clock. All available at www.kronosrobotics.com

  16. #16
    Join Date
    Aug 2010
    Posts
    686

    Re: CNC Construction Set Build 3 Blog

    Volume 2 - Chapter 6 - Squaring the Gantry

    Got the gantry all squared up. It took me a couple extra attempts as I was moving a little too fast for my own good. Take your time with this one.
    Attachment 416990

    I did finish the more advanced pen holder. This one can also hold other tools such as a drag knife.
    Click image for larger version. 

Name:	_MG_1565.jpg 
Views:	0 
Size:	50.0 KB 
ID:	416992
    Author of: The KRMx01 CNC Books, The KRMx02 CNC Books, The KRmc01 CNC Milling Machine Books, and Building the HANS Electric Gear Clock. All available at www.kronosrobotics.com

  17. #17
    Join Date
    Aug 2010
    Posts
    686

    Re: CNC Construction Set Build 3 Blog

    Volume 2 - Chapter 7 - Y Drive Plates

    The templates attached to the plate stock.
    Attachment 416994

    With hardware installed.
    Attachment 416996

    Attached to the machine.
    Attachment 416998

    I have included a little fancier design.
    Click image for larger version. 

Name:	_MG_1657.jpg 
Views:	0 
Size:	82.5 KB 
ID:	417000
    Author of: The KRMx01 CNC Books, The KRMx02 CNC Books, The KRmc01 CNC Milling Machine Books, and Building the HANS Electric Gear Clock. All available at www.kronosrobotics.com

  18. #18
    Join Date
    Aug 2010
    Posts
    686

    Re: CNC Construction Set Build 3 Blog

    Volume 2 - Chapter 8 - X Drive Mounts

    I used the templates to lay out the bearing and motor mount holes.
    Attachment 417002

    I calculated my reference line and attached the two extrusion mounting templates.
    Attachment 417004

    As an option you can use the corner cutout template to shape the X drive mounts. This cut is optional and is for aesthetic purposes only. Once I cutout the corners, the mounts are ready for the final paint.
    Attachment 417006

    Mounted
    Attachment 417008
    Click image for larger version. 

Name:	_MG_1608.jpg 
Views:	0 
Size:	105.6 KB 
ID:	417010
    Author of: The KRMx01 CNC Books, The KRMx02 CNC Books, The KRmc01 CNC Milling Machine Books, and Building the HANS Electric Gear Clock. All available at www.kronosrobotics.com

  19. #19
    Join Date
    Aug 2010
    Posts
    686

    Re: CNC Construction Set Build 3 Blog

    Volume 2 - Chapter 9 - Y Drive Mounts

    I attached the templates:
    Attachment 417012

    Ready for the final finish:
    Attachment 417014

    Mounted:
    Attachment 417016
    Click image for larger version. 

Name:	_MG_1618.jpg 
Views:	0 
Size:	80.9 KB 
ID:	417022


    Don't forget to remove the work table and T-nuts before installing the front mounts. I did and had to go back and remove them to get the table off.
    Click image for larger version. 

Name:	_MG_1625.jpg 
Views:	0 
Size:	156.9 KB 
ID:	417018

    Make sure you add the 6 T-nuts to each side of the frame as shown here:
    Click image for larger version. 

Name:	_MG_1621.jpg 
Views:	0 
Size:	81.4 KB 
ID:	417020
    Author of: The KRMx01 CNC Books, The KRMx02 CNC Books, The KRmc01 CNC Milling Machine Books, and Building the HANS Electric Gear Clock. All available at www.kronosrobotics.com

  20. #20
    Join Date
    Aug 2010
    Posts
    686

    Re: CNC Construction Set Build 3 Blog

    Volume 2 - Chapter 10 - Z Drive Mounts

    I attached the templates as usual and marked my holes.
    Attachment 417024

    I used a small vise to hold the plate while I drilled the edge holes.
    Attachment 417026

    All the hardware installed. Remember to remove the Z-carriage before installing the Z drive mounts.
    Attachment 417028

    The drive plates installed.
    Attachment 417030
    Author of: The KRMx01 CNC Books, The KRMx02 CNC Books, The KRmc01 CNC Milling Machine Books, and Building the HANS Electric Gear Clock. All available at www.kronosrobotics.com

Page 1 of 3 123

Similar Threads

  1. Replies: 35
    Last Post: 03-13-2018, 03:41 AM
  2. New Design/Build: CNC router (steel plate construction) + Raspberry Pi
    By cmadki4 in forum DIY CNC Router Table Machines
    Replies: 41
    Last Post: 09-24-2017, 03:11 PM
  3. Replies: 4
    Last Post: 07-24-2013, 11:48 AM
  4. DIYLILCNC PVC Build - Bed Construction
    By jimmycakes in forum DIY CNC Router Table Machines
    Replies: 0
    Last Post: 12-10-2010, 05:58 PM
  5. 9'X5.5' Router table - Build Blog...
    By turbotoys in forum DIY CNC Router Table Machines
    Replies: 12
    Last Post: 09-13-2007, 04:20 PM

Tags for this Thread

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •