Hello!
When following the maintenance procedure to adjust/confirm the zero point on my machine, I get a message saying "ADJUST. OF ZERO-PT.DOG IS REQD".
It says to refer to the operation manual, and I do not have that manual.

Does anyone have that manual or know how to perform this adjustment?
I need to do this on both the X and Y axis.

Thank you,
Casey