    Question VF2 Very Long Tool Change Delay, Over a Minute.

    Hello,

    We have been working on an older ('00) VF2 that has had some issues.
    Got them all save one. If I initiate a tool change in MDI, M06Tblah blah, the Z goes to where it needs to, orients, nothing for 1 minute 21 seconds, then zip-zap, normal tool change.
    "Running" is displayed during this time and once the change is complete, "Program End" is displayed.
    Same thing during "Power Up / Restart".

    I've looked around and read something about parameter 601 Tool Change Delay but can't find it on this mill.
    Is there a secret door, handshake, or some such thing to get access to this parameter? Am I looking in the wrong spot?

    TIA,

    H.R.

  2. #2
    Join Date
    Sep 2006
    Posts
    94

    Re: VF2 Very Long Tool Change Delay, Over a Minute.

    Ok, I found the problem.
    Somewhere along the line a few parameters got scrambled.
    143 - DRAW BAR Z VEL CLMP: should be 250000, was 537120912.
    222 - ROTARY AXIS INCRMNT: should be 0, was 134217728.
    223 - AIR TC DOOR DELAY: should be 0, was 4096.
    306 - POCKET UP/DN DELAY: should be 0, was 134217728.

    222 & 223 are for Horizontal mills.

    Have no idea how it happened but it did.

  3. #3
    Join Date
    Mar 2010
    Posts
    1852

    Re: VF2 Very Long Tool Change Delay, Over a Minute.

    Jussssssst a little bit different.
    Two Haas VF-2's, Haas HA5C, Haas HRT-9, Hardinge CHNC 1, Bother HS-300 Wire EDM, BobCAD V23, BobCAD V28

Similar Threads

  1. Change time delay in tool change program
    By bspear in forum Bridgeport / Hardinge Mills
    Replies: 0
    Last Post: 08-30-2018, 04:01 PM
  2. Long Tool change on Mazak I -150
    By momantech in forum Mazak, Mitsubishi, Mazatrol
    Replies: 0
    Last Post: 10-25-2012, 12:02 AM
  3. Delay during tool change on VF2
    By JWH in forum Haas Mills
    Replies: 3
    Last Post: 07-25-2012, 12:57 AM
  4. TM3 tool changer delay
    By hankster in forum Haas Mills
    Replies: 8
    Last Post: 11-03-2008, 01:28 AM
  5. 640T Tool eye sensor delay time out
    By Shotout in forum Mazak, Mitsubishi, Mazatrol
    Replies: 2
    Last Post: 07-03-2007, 05:04 PM

Tags for this Thread

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •