Hi, would anyone please be willing to check if this is correct?
I needed to transfer the program from Sumerik to Heidenhain.
But I don't know if it's OK? Thanks

Iso-
N10 G1 F2000 G90 G520 X101.0 Y0 Z0 D0
N15 M00;MESS-SYSTEM EINSETZE
N20 G64 G1 F500 X100 Y0 ;STARTTRIGGER
N30 G3 X100 Y0 I-100 J0 F2000; 2MAL360GRAD GEGEN UHRZEIGERSINN
N40 G3 X100 Y0 I-100 J0
N50 G1 X101.0;ENDTRIGGER
N55 G4 F5
N60 G1 F500 X100 Y0; STARTTRIGGER
N65 G2 X100 Y0 I-100 J0 F2000; 2MAL 360GRAD IM UHRZEIGERSINN
N70 G2 X100 Y0 I-100 J0
N75 G1 X101.0 ;ENDTRIGGER
N80 M30
;KDYS KARA HLASI CEKAT NA VRETENO TAK PRIPSAT G94


Heid-
0 BEGIN PGM test MM
1 L X+101 Y+0 Z+0 F200
2 M00;POUZIVEJTE MERICI SYSTEM
3 L X+100 Y+0 F500;START SPUSTENI
4 CC X+0 Y+0
5 C X+100 Y+0 DR+
6 L X+101 F200
7 CYCL DEF 9.0 DWELL TIME
8 CYCL DEF 9.1 DWELL 5
9 L X+100 Y+0 F200; START SPUSTENI
10 CC X+0 Y+0
11 C X+100 Y+0 DR-
12 L X+101 F200
13 M30
14 END PGM test MM