    Re: Working On A New "Timber Frame" Design and Build.

    Electrical components are beginning to arrive.

    One of the motors. Really nice hardware!

    The G-Penny spindle arrived. It was packaged really well and was quick shipping. Fits like a glove on the spindle mount I cut.

  3. #83
    Join Date
    Dec 2020
    Posts
    167

    Re: Working On A New "Timber Frame" Design and Build.

    An excellent friend of mine donated the electrical enclosure to the project!! I will have plenty of space in this monster.

  4. #84
    Join Date
    Dec 2020
    Posts
    167

    Re: Working On A New "Timber Frame" Design and Build.

    The devil is always in the details. I have the motors and drives installed for X & Y. Trays to support the drag chain and the chains installed. Waiting on an Oldham coupler to arrive for the Z so I can install the motor for it. Have proximity sensors installed and cables for them and the motors pulled through the drag chain. Slowing getting through the details for the electrical build.

  5. #85
    Join Date
    Dec 2003
    Posts
    1217

    Re: Working On A New "Timber Frame" Design and Build.

    The engine turned finish is quite spectacular.

  6. #86
    Join Date
    Dec 2020
    Posts
    167

    Re: Working On A New "Timber Frame" Design and Build.

    Quote Originally Posted by routalot View Post
    The engine turned finish is quite spectacular.
    Thanks! I am glad I spent the extra time doing them to add a little polish to the machine.

    Drill and tap arrived for the 1/2-20 thread in the air cylinder rod mount, so I got the mount made and installed the air cylinder and the mount block.

  7. #87
    Join Date
    Feb 2012
    Posts
    181

    Re: Working On A New "Timber Frame" Design and Build.

    Your progress has been awesome Loren, really great fabrication and so many good design decisions. If you don't mind sharing, what does the pneumatic loop look like for your z relief? are you using an accumulator to hold pressure and trading off the relatively small volume change during cylinder stroke, or is it going to be venting on the down stroke?

    Looking forward to seeing it moving

  8. #88
    Join Date
    Dec 2020
    Posts
    167

    Re: Working On A New "Timber Frame" Design and Build.

    Thanks Luke! I am looking forward to seeing it move too. For the air cylinder counter balance I will regulate shop air to probably a 5 gallon tank, and then to the retract side of the air cylinder. It will be 15-25 psi. I haven't run the final numbers yet. Then exhaust the extend side of the air cylinder to atmosphere. That should make for a pretty nice air spring.

  9. #89
    Join Date
    Dec 2020
    Posts
    167

    Re: Working On A New "Timber Frame" Design and Build.

    Working on getting the electrical layout done. I think I have the last few hardware pieces arriving this week.

    The photo is a draft of the panel layout. I have 220v single phase entering on the lower left to terminal blocks from a main power disconnect switch.

    Controlling power to the large 72V power supply and VFD via relays being switched by the E-Stop switch. This way I can drop power from the spindle and motors, but the 5V and 24V logic power supplies will still be powered if the E-stop is hit.

    Fuses to the 72V PS, VFD, and power to the motors. Also a breaker at the main power panel for the shop.

    I will have more wire raceway in place, just not shown in the photo.

    Thoughts? What am I missing?
    Attached Thumbnails Attached Thumbnails IMG_9371.jpg  

  10. #90
    Join Date
    Jul 2018
    Posts
    6321

    Re: Working On A New "Timber Frame" Design and Build.

    Hi Loren - I think it needs more yellow Peter

  11. #91
    Join Date
    Dec 2020
    Posts
    167

    Re: Working On A New "Timber Frame" Design and Build.

    Oh yes! The yellow wires, how could I forget those? Back to the store for another Sharpie...lol

  12. #92
    Join Date
    Dec 2020
    Posts
    167

    Re: Working On A New "Timber Frame" Design and Build.

    Working on getting the electrical panel built and wired.
    Attached Thumbnails Attached Thumbnails IMG_9376.jpg  

  13. #93
    Join Date
    Dec 2020
    Posts
    167
    Still working on getting the electrical installed.
    Attached Thumbnails Attached Thumbnails EE931653-82F8-44CE-BAC3-2D7F187FF9B0.jpg   6B62C1BA-F077-434B-B23F-82277FC4F755.jpg   1B2765C7-FC2A-4DD6-88D6-D60BAC6ABF56.jpg  

  14. #94
    Join Date
    Dec 2020
    Posts
    167
    Getting closer on the electrical build. The VFD now connected to the spindle and power in the panel. I still need to wire logic control to the VFD. E-Stop is installed and circuit completed. I did decide to install a second E-stop switch, so it is on order, but wire is run for it so will be a quick install. Labeled all the business ends of control wires and tied down all those wires. I have cable glands installed in the enclosure and ready to start landing all the control wiring for the motors and prox switches in the enclosure on the motion controller and power supplies.
    Attached Thumbnails Attached Thumbnails A9EB505A-FA06-4389-93F2-3A4E8BA8EEC0.jpg   A8F27D48-6E37-49D1-8E87-F59DB511CB39.jpg   76534A04-740A-43C6-9F7D-A038731631A3.jpg   090A36A5-60E6-4FC6-B7D1-CA432E82D0D1.jpg  

    C68E39DD-6FD4-4DBF-BFD8-0B8BF1B5530F.jpg   FD24C6BB-E906-4BF3-AFBB-8CECC3B4CB91.jpg  

  15. #95
    Join Date
    Jul 2018
    Posts
    6321

    Re: Working On A New "Timber Frame" Design and Build.

    Looking Grand Loren - But where's the yellow? Peter

  16. #96
    Join Date
    Dec 2020
    Posts
    167

    Re: Working On A New "Timber Frame" Design and Build.

    Yellow for what?

  17. #97
    Join Date
    Jul 2018
    Posts
    6321

    Re: Working On A New "Timber Frame" Design and Build.

    Just joking Yellow makes it go faster. Peter

  18. #98
    Join Date
    Dec 2020
    Posts
    167

    Re: Working On A New "Timber Frame" Design and Build.

    Well yes, it does, and yellow crimp terminals are like electrical turbochargers. Way fast than yellow wire.
    Attached Thumbnails Attached Thumbnails Yellow.JPG  

  19. #99
    Join Date
    Dec 2020
    Posts
    167

    Re: Working On A New "Timber Frame" Design and Build.

    Making headway! Axes all homing, all calibrated, gantry squared, motor tuned for now. (running them a little soft with the machine still up on the rolling casters and not on the solid feet. I have a lot more gray hair and my patience for electrical stuff is worn thin!


  20. #100
    Join Date
    Jul 2018
    Posts
    6321

    Re: Working On A New "Timber Frame" Design and Build.

    Hey Loren - That's fantastic. Your lucky you have grey hair I have no hair! At least on my head Peter

Page 5 of 8 34567

Similar Threads

  1. Profile Rail Wood Frame Router, 25" x 37" x 6" working area
    By jpvonoy in forum CNC Wood Router Project Log
    Replies: 76
    Last Post: 03-01-2019, 03:47 AM
  2. First Build-Steel Frame-Cutting Area 2'3"x2'3"
    By Rock380Star in forum CNC Wood Router Project Log
    Replies: 1
    Last Post: 04-15-2018, 08:10 AM
  3. Replies: 3
    Last Post: 01-21-2017, 11:01 PM
  4. First Router Build, Is The Frame "Beefy Enough"
    By jimbooboo in forum DIY CNC Router Table Machines
    Replies: 2
    Last Post: 04-06-2008, 06:49 PM

Tags for this Thread

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •