585,969 active members*
4,381 visitors online*
Register for free
Login
Results 1 to 4 of 4
  1. #1
    Join Date
    Mar 2022
    Posts
    2

    Machine Moved, Gantry Repositioned

    Hello guys, New here. Just bought a used AVID cnc router with clearpath/technik servos. The machine was jogged xyz during demo, was disassembled and had to move and transport to another location.

    Now that I am re-assembling it and throwing the x-axis beam back onto the servo drives, anything I need to be aware of? Alignment, pre power-on checklist?

    Both servos had been slid to another location independently during cleaning and transport (unpowered/disconnected).

    Before I power on and do anything, My fear is that the servos may go in random directions, mostly due to the lack of my knowledge of not having ran a cnc like this before.

    Any tips or suggestions for power on? Will the servos try to go back to their initial position? or do I manually home everything after tramming? The machine is using mach 4 and has crew 9.

    Thanks in advance!

    Mike

  2. #2
    Join Date
    Dec 2013
    Posts
    5717

    Re: Machine Moved, Gantry Repositioned

    I would expect that homing is all that should be required. Something you would do on any power up.
    Jim Dawson
    Sandy, Oregon, USA

  3. #3
    Join Date
    Dec 2003
    Posts
    1224

    Re: Machine Moved, Gantry Repositioned

    Quote Originally Posted by Jim Dawson View Post
    I would expect that homing is all that should be required. Something you would do on any power up.
    ^+1

    Once powered up and running cut out a square of a decent size and measure the diagonals to verify that the alignment hasn't been disturbed.The bigger the square,the easier it will be to find discrepancies-but hopefully none will be present.

  4. #4
    Join Date
    Mar 2003
    Posts
    35538

    Re: Machine Moved, Gantry Repositioned

    Before I power on and do anything, My fear is that the servos may go in random directions, mostly due to the lack of my knowledge of not having ran a cnc like this before.
    In this case, power up the machine with the motors off the machine, or with the pinions disengaged from the gear racks.
    Gerry

    UCCNC 2017 Screenset
    http://www.thecncwoodworker.com/2017.html

    Mach3 2010 Screenset
    http://www.thecncwoodworker.com/2010.html

    JointCAM - CNC Dovetails & Box Joints
    http://www.g-forcecnc.com/jointcam.html

    (Note: The opinions expressed in this post are my own and are not necessarily those of CNCzone and its management)

Similar Threads

  1. Machine moved before received the arc OK signal
    By phamandp in forum CNC Plasma / Oxy Fuel Cutting Machines
    Replies: 5
    Last Post: 06-15-2020, 10:52 AM
  2. Replies: 0
    Last Post: 11-11-2017, 07:49 AM
  3. Moved a machine and now getting poor tool life!! Help!!
    By jmk021083 in forum Daewoo/Doosan
    Replies: 7
    Last Post: 02-08-2016, 04:58 PM
  4. Replies: 1
    Last Post: 11-04-2015, 06:01 PM
  5. Replies: 6
    Last Post: 08-01-2006, 03:37 PM

Tags for this Thread

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •