    How would you move a VMC around the shop?

    We had the riggers move the VMC into place, but I'm pondering how to move it out of the way so we can re-lay the bed of concrete it's sitting on...

    The 9000 lbs weight makes it seem my forklift couldn't touch it... (5500 lbs max)
    nor any similar conventional method... I have a 1 ton gantry (2k lbs?) and a few
    even less suitable products... There isn't enough space to drive in a full size
    forklift, not without moving a bunch of other similarily sized objects out of the way first.

    At this point I'm actually thinking a few dozen guys and bunch of turned steel bars under the unit...

    Any suggestions?

  2. #2
    Join Date
    Jul 2007
    Posts
    195
    Call the riggers back and bite the bullet for the couple hundred bucks.
    They have insurance if they drop it, you don't!
    Be carefull what you wish for, you might get it.

  3. #3
    Join Date
    Jan 2004
    Posts
    3154
    You can rent hydraulic jacks and machinery movers skates at a local industrial rental store.
    www.integratedmechanical.ca

  4. #4
    Join Date
    Jul 2005
    Posts
    12177
    See the picture.

    We have used these skids to move several machines around the shop. Our 4500lb forklift can push or pull with ease. Also we put in anchor points at different places around the shop; just grout 5/8" threaded inserts into holes in the concrete and then you can screw eyebolts in and use a Come-Along.

    EDIT: The picture shows the machine being lifted with a forklift; most times we use an Enerpac with a stubby hydraulic cylinder that has a 1/2" lift. It doesn't take long to work the machine up high enough with a few bits of 3/8" flat bar as shims. Whole sight cheaper than renting equipment or calling in riggers.

    I also like these skids because they can be slid any direction. Dollies are directional and have to be steered with a lever.
    Attached Thumbnails Attached Thumbnails VF2MOVE 7.jpg  
    An open mind is a virtue...so long as all the common sense has not leaked out.

  5. #5
    Join Date
    Mar 2007
    Posts
    207
    Quote Originally Posted by yaddatrance View Post
    ....At this point I'm actually thinking a few dozen guys and bunch of turned steel bars under the unit...
    After they're done at your shop, send them to ours... we've got some furniture moving to do as well.

    Actually I don't think a shop should be without a set of machine moving dollies (roller dollies). They ain't cheap, but ours have paid for themselves many times over.

    www.mcmaster.com has a good selection.

    john

  6. #6
    Join Date
    Dec 2005
    Posts
    3319
    We did something like what you want to do as follows:

    Lift up one side of the machine with your fork lift. Block it off center so that when you let the lifted side down, the resting side rises which you block up HIGHER than the off center pivot.

    You do this back and forth and can jack it up as high as you want need. That doesn't get it high enough to chip out the concrete but it can be high enough to get dollies of some sore under it to roll it along.

    For the cost of a VMC, however, I'd call the riggers for reasons cited in post #2. I did this when I had to unload a V2XT and it was over before I knew it.

  7. #7
    Join Date
    Feb 2006
    Posts
    58
    Thanks guys! The suggestions were far more convenient than I expected...

    We'll try the moving skates and try taking it slow, I didn't know they made them for big compressive loads, the skids also looks like a good idea for the future, but the flooring currently is less than pristine... The rigger idea is kept in mind for future moves if this turns out to be more of a pain than expected...

    Heh, I'm chuckling at the idea of being the poor sap asked to chip away concrete underneath a VMC...

  8. #8
    Join Date
    Jan 2004
    Posts
    3154
    My heaviest skates are rated at 15 ton each.
    Considering my biggest jack is 10 ton and my biggest forklift is 9 ton, they are more than heavy enough.
    Out of the 4 different sets of "skate" that we have our favourite ones are McMaster# 2496T78
    I find that the VMCs (unless really big) move best with 3 skates. The bases are small enough that they balance very well and you never get a loose or twisted skate like you will with 4 under.
    www.integratedmechanical.ca

Similar Threads

  1. OK, now I'm on the move at last...
    By Piobaire in forum Centroid CNC Control Products
    Replies: 8
    Last Post: 07-09-2007, 11:24 PM
  2. No Z up on move
    By cncadmin in forum Mach Software (ArtSoft software)
    Replies: 4
    Last Post: 03-20-2005, 07:08 PM
  3. The X-Axles... to move or not to move!
    By Wild4aces in forum Mechanical Calculations/Engineering Design
    Replies: 1
    Last Post: 03-18-2005, 08:26 PM

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •