Hello,
i have problem with correct moving of Measuring probe.
I want to measure points in following order : 1,4,2 and 5
Attachment 482660
Measuring points 1 and 4 are correct, but 2 and 5 are on different plane (MAC), and when its starting to measure point 2 probe go to position 4 and then, rotate to position 2 (it will crash with stock and i need to stop machine).
Idea is when measure point is finish to go up (Z250) and then to next point.
Can someone please check CNC code in attachment i think my post processor is bad.
Thanks in advanced!