585,883 active members*
5,266 visitors online*
Register for free
Login
Results 1 to 4 of 4
  1. #1
    Join Date
    Apr 2006
    Posts
    125

    Run time estimation

    Hi Scott,
    Just installed the latest version.

    On machine configuration (Lathe), I just noticed there's no Run time estimating dialogue box to configure the rapids + t/c time (as there is in the mill)?

    Cheers,
    Terry

  2. #2
    Join Date
    Mar 2003
    Posts
    765
    Terry,

    You don't get the dialog box at all? What happens when you click the menu for run time estimating?

    Scott

  3. #3
    Join Date
    Apr 2006
    Posts
    125
    Hi Scott,
    If I generate a report, it gives a rapid rate of 100, with a tool change time of 5 s (defaults?).
    Cheers,
    Terry

  4. #4
    Join Date
    Mar 2003
    Posts
    765
    Terry,

    There are settings in the Machine Configuration now for the rapid rate and tool change time. These are probably what you are seeing.

    Scott

Similar Threads

  1. First time with CNC
    By witisi in forum Community Club House
    Replies: 0
    Last Post: 05-04-2008, 11:28 PM
  2. Run Time
    By Tazzer in forum Haas Mills
    Replies: 2
    Last Post: 03-29-2008, 02:46 AM
  3. milling time (not to be confused with hammer time)
    By barefoot0 in forum G-Code Programing
    Replies: 4
    Last Post: 05-03-2007, 12:18 AM
  4. X2 Conversion Time (shopping time)
    By Micro Rotors in forum Benchtop Machines
    Replies: 2
    Last Post: 03-04-2007, 06:11 PM

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •