Getting ready to move this machine into a different building. Was looking on how to secure this machine. The manual keeps talking about: " The head and the counter weight must be secured before lifting the VMC"
We searched this forum and found something similuar. It stated that we need to lower the head "Z" so the holes line up in back? Then insert 2 bars to secure? Would be gratefull on any advice.
Thanks,
Bob