585,978 active members*
4,285 visitors online*
Register for free
Login
IndustryArena Forum > MetalWorking Machines > Bridgeport Machines > Bridgeport / Hardinge Mills > Model # 2R2EA S# 186 Bridgeport R2E4 Boss 9.2 Programming
Results 1 to 2 of 2
  1. #1
    Join Date
    Apr 2007
    Posts
    243

    Question Model # 2R2EA S# 186 Bridgeport R2E4 Boss 9.2 Programming

    I need to know if I can use normal RS - 232 communications with this machine. Predator Editor

    And the format of the G-code so I can write a post for it.

    I know the machine is from the 80's

    I hope it doesn't have the EZ Troll communication protocols.

    Anyone that would know about this machine please write back or give me a call.

    Bridgeport R2E4 Boss 9.2 Programming

    727-744-2276


    Regards,

    Allen

  2. #2
    Join Date
    Nov 2004
    Posts
    3028
    I had a R2E4. First of all I recommend getting a programming manual. Try machinemanuals.net or Ebay.
    At first I used a Radio Shack TRS80 model 100 to upload download and edit with RS232.
    Later I used a MAC running EZCAM (EZMILL) to generate programs and download.
    I have also used PROCOMM for upload and download as well as editing in terminal mode (chat). It was a DOS shareware version. Similar to KERMIT.
    Powerful editor and canned cycles.
    Port A is used for upload, download and editing. Port B for EZLINK uploads/downloads and DNC.
    Control can store more than one program but memory is limited. Most CAM systems have many extra lines of code. Typically I could consolidate a 8 page program to less than one using loops and macros.

    George
    (Note: The opinions expressed in this post are my own and are not necessarily those of CNCzone and its management)

Similar Threads

  1. BridgePort Series I CNC BOSS 9 / R2E4 Problems
    By gbarker in forum Bridgeport / Hardinge Mills
    Replies: 8
    Last Post: 06-18-2010, 11:51 AM
  2. Communications Problem: PC--> Bridgeport Model R2E3 (BOSS 8)
    By rams_head in forum Bridgeport / Hardinge Mills
    Replies: 0
    Last Post: 03-05-2009, 03:15 AM
  3. Archie's first cnc machine Bridgeport R2E4 Boss 9 to Mach 3
    By jeep534 in forum Vertical Mill, Lathe Project Log
    Replies: 8
    Last Post: 09-10-2008, 06:47 PM
  4. Bridgeport Series II CNC w/ BOSS - Programming
    By rocknrolljunky in forum Bridgeport / Hardinge Mills
    Replies: 35
    Last Post: 09-11-2007, 07:56 PM
  5. Bridgeport CNC Mill, Model R2E4, Boss 9 Control
    By Tbucit in forum Bridgeport / Hardinge Mills
    Replies: 5
    Last Post: 03-18-2006, 04:39 AM

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •