Ordered two new complete 10 foot rails,gear racks,guides,gears and belts for my 5 by 5 ez route plasma table. This is going to be a winter project.First I'm rounding up all the parts,then remove gantry and old rails,rework the table frame , then double the size of the water pan,put on a fresh coat of paint and put it all back together.Hope to be down only 7 to 10 days. I'm not going to tear down until I have all the parts needed. I'm wondering if anyone else has tackeled this and if there are any suprises waiting for me? I already have the brain box mounted on the wall and will have to move it about 30 inches so that it is at the center of the table and have 5 ft of travel each way.I'll try to get before,during and after pics. THANKS,,,,,,,,CURLY