588,484 active members*
5,175 visitors online*
Register for free
Login Register
EZCAM Forum
Uncategorised WoodWorking Machines > PACER 2515 - No power going to the Spindle and the bed vacuum
Results 1 to 1 of 1
\r\n\r\n
\r\n
\r\n \r\n
\r\n \r\n
\r\n paulnut10\r\n \r\n
\r\n paulnut10 is offline\r\n\r\n \r\n \r\n Member\r\n \r\n \r\n\r\n \r\n \r\n \r\n \r\n \r\n
\r\n
\r\n \r\n
\r\n
\r\n
Join Date
Nov 2023
\r\n \r\n \r\n
Posts
1
\r\n \r\n
\r\n \r\n \r\n
\r\n \r\n
\r\n
\r\n\r\n
\r\n \r\n
\r\n \r\n

\r\n PACER 2515 - No power going to the Spindle and the bed vacuum\r\n

\r\n \r\n \r\n \r\n
\r\n
\r\n
\r\n Hello,
\r\n
\r\nThis is my first post on this ezcam/forum.
\r\n
\r\nPurchased a PACER 2515-K3 CNC, fired it up, to find a stack of errors in the XMC-E Software, managed to sort that out by changing the battery on the PC\'s motherboard, reset the time and date and reset the machine and PC.
\r\n
\r\nSo now we can load a job in, start the job. The spindle goes to the datum fine, and starts the routing route. Problem is the spindle doesn\'t spin and the vacuum bed doesn\'t come on.
\r\n
\r\nWe\'ve checked and found there isn\'t power going to the spindle or the vacuum bed. Does anyone know if there is a setting in the XMC-E software which turns on both the spindle router and the vacuum bed power. Or should should these already have power.
\r\n
\r\nDo I need to look further back in the machine, ie in the control panel, or is this software control problem
\r\n
\r\nAny help would be massivley appreciated,\r\n
\r\n
\r\n\r\n \r\n\r\n\r\n
\r\n \r\n \r\n \r\n \r\n \r\n
\r\n
\r\n
\r\n
\r\n \r\n \r\n \r\n \r\n \r\n Reply With Quote Reply With Quote \r\n \r\n \r\n \r\n \r\n \r\n \r\n \r\n \r\n \r\n\r\n \r\n \r\n\r\n \r\n\r\n \r\n \r\n\r\n \r\n \r\n \r\n \r\n \r\n \r\n
\r\n
\r\n
\r\n\r\n'; // next/previous post info pn[2570363] = "2570363,2570363"; pn[0] = ",2570363"; // cached usernames pu[0] = guestphrase; pu[924969] = "paulnut10"; // -->

Threaded View

  1. #1
    Join Date
    Nov 2023
    Posts
    1

    PACER 2515 - No power going to the Spindle and the bed vacuum

    Hello,

    This is my first post on this forum.

    Purchased a PACER 2515-K3 CNC, fired it up, to find a stack of errors in the XMC-E Software, managed to sort that out by changing the battery on the PC's motherboard, reset the time and date and reset the machine and PC.

    So now we can load a job in, start the job. The spindle goes to the datum fine, and starts the routing route. Problem is the spindle doesn't spin and the vacuum bed doesn't come on.

    We've checked and found there isn't power going to the spindle or the vacuum bed. Does anyone know if there is a setting in the XMC-E software which turns on both the spindle router and the vacuum bed power. Or should should these already have power.

    Do I need to look further back in the machine, ie in the control panel, or is this software control problem

    Any help would be massivley appreciated,

Tags for this Thread

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •