Got it! Thanks for looking
Type: Posts; User: l u k e
Got it! Thanks for looking
So it turns out Haas has been giving me instructions for new software and not my 2008 version. The guy I'm talking said he knows nothing about the version I'm running and is stumped on how to unlock...
The first response from my local HFO didn't work at all, then I got a second email from someone else at the same HFO and it was completely different from the first. The second answer came off more as...
I know I can use 0-200 tool numbers on my VF2 but I can't find any information to get it setup. I have setting 90 set to 200 but that's as far as I've gone. I've searched the internet and even...
Any idea's where one might be purchased without having one made? I can't use a tap extension due to diameter constraints.
Sorry, I didn't know the link was broken, but yes, Lumiclad is what I'm inquiring about. https://www.birchwoodtechnologies.com/Process-Equipment/BK-LC-Mini-Lumiclad-Tank-Line.html
Still wondering if anyone uses this process for aluminum?
I'm running this one>
BRS 4 Stage Value Plus RO/DI System - 75GPD - Bulk Reef Supply
Is this a machining vise or a drill press vise? Trying to figure out if it will hold up to cnc machining, with the knurled thumb screw it makes me question if it has the clamping strength.
...
This?
http://i550.photobucket.com/albums/ii405/mtumbleson/4%20001_zpsarypg4cc.jpg
Before I purchased the machine (used) I called the Haas factory and had them check the serial number to verify the listed specifications, they did said it was wired for a 4th axis direct from them. I...
The only plugs on the side of the electrical box at the back of the machine is the two I showed in the3rd post of the RS232 and a 110 outlet at the bottom of the panel, all of the other round holes...
Here's a few pictures of my setup>
These are the only plugs on the side of the electrical cabinet>
http://i550.photobucket.com/albums/ii405/mtumbleson/4th%20axis%20drive%20005_zpsnuqn7nbq.jpg...
I'm looking into adding an indexer to my 2008 VF2, it is currently wired for the 4th axis. My local HFO said in 2010 Haas went from a brushed motor to brushless. He said I can add the Sigma-1 servo...
Ahh, I didn't know that, is it to help oil the spindle or something?
How long should the spindle air typically run after a tool change on a 2008 VF2? I just timed mine and the air ran for a full minute after a tool change, but I swear on occasion it runs longer.
My...
Just for the record it's 4-1/4"
[QUOTE=Fletch_CNC;1837054]For your current set up, all you need to do is put the difference in height between your tool touch off and the top of work into your work Z offset. It doesn't matter how...
Ynda is getting where I'm coming from, so just to clarity for the others that suggested I just put -4.0 in Z.
This is my current setup....
4 inches is from the top of the vise not the top of the part, what you suggest makes no sense.
That does not answer the question.
I set my tool offsets 4" above my vise then subtract that measurement from my part top like many people do. Up to now, I do the math on a calculator then input the sum into the control. On occasion...
How much Z axis does a Haas VF2 (2008) use for a tool change? I know I could guess it pretty close but I was wondering what the exact measurement was.
I have two on order so we'll see. :)
Does the HDL6J have "bolt thru" holes to mount to the table or can it only be mounted with toe clamps?
http://www.kurtworkholding.com/images/high%20density/HDLM6J.jpg
I was intending on using Kurt's Side Winder vise>>
http://www.machinery.co.uk/article-images/47085/Kurt%20Sidewinder_popup.jpg
That was my first thought... How well do you suppose a 5/8 mill would do with a DOC of 5.374"?
Does anyone know if ISCAR makes custom tooling? I've sent several emails and they have not answered. I can't figure out of to locate a tool rep on their site.