I'm just curious if any one had built a secondary gantry for, say a Torchmate 2x2. Although it still limits the total cut to 2x2, if one built a 4x4, or 4x8 water table and a secondary gantry system to manually move the 2x2 Torchmate into 4 different quadrants, at least one could use a half or full sheet of material. Bonus would be a water table with lots of room for manual cutting as well..... Any thoughts?