Hey y'all,
I have a Doosan 2000SY lathe with a Fanuc 18i-tb Control and when I want to perform a part eject and catch at the end of the cycle, it takes up a lot of time. It needs to blow off the part, move part catch into position, open chuck, eject part, lower parts catch, and finally close chuck. All these operations take up about 10 seconds. Would it be possible to create a single M-code (with possible ladder changes) so that all these operations are done in order with proper dwells all while the machine continues cycling onto the next part?