Re: M-code To Perform Series of Operations
hy
blow off the part - 1sec
catcher advance - <0.5sec
open chuck - <0.5sec
eject part - how is the part ejected ?
catcher retreat < 0.5sec
close chuck < 1sec
if all those is 10secons, my guess it part ejecting is too slow
Up to three M codes can be specified in a single block
actually, it does not matter if M are all on single line, or on individual lines
what matters, is how those M codes are executed one in relation to other, thus what are the conditions for them to begin execution, and how are they confirmed; is definetly particular to cnc brand such conditions normally, are group specific
an aproach possible on okuma machine, is to simply ignore their answer, thus each code will start its exectuion regardless of what the previous code status is; check this function if available on your machine
my ultimate goal is to have one m-code to perform all of these functions while the machine continues forward?
if your last operation is closing the chuck, and you wish to run it in background, then what do you wish to do while the chuck is still opened ? kindly
Ladyhawke - My Delirium, https://www.youtube.com/watch?v=X_bFO1SNRZg