Yes, I am definitely getting one, despite not even having a stand built for my mill yet, much less having it CNC'ed.

I'm trying to decide between the 6" and the 8". The 8" carries a $100 penalty (+$50 cost, +$50 ship), and is gonna be a bugger to lift onto and off of the table. I just don't know if I need all the capacity, or if the 6" would do me.

-Steve