Hi all
I want to know if anyone have some experience with realtime data input into spreadsheets. I have four height gauges that must input data into a spreadsheet in the correct cells and not always at the same time.

I have a usb input for every height gauge and as the machine operator does his QC, the data needs to be shown and processed in a spreadsheet. Sometimes the measurements can not be done in a specific order, thus each measurement must go into its own column or row.

Anyone out there???:stickpoke