587,731 active members*
3,234 visitors online*
Register for free
Login

Thread:

Results 1 to 20 of 266

Hybrid View

  1. #1
    Join Date
    Mar 2003
    Posts
    35538
    Finally finished the top plate. Also had room for 1 row of spacers. The second set of spacers will be 1" thick, as I need an extra 1/4" for the E chain I'll be using. I drilled holes in the plate and spacer to glue them down, but I might just put pins in the holes for alignment and just glue and staple it all together.

    Need to order a 4mm tap tonight for the linear rail bolts, as I want to tap the holes before I assemble everything. I'm hoping to get all the holes drilled and tapped this weekend.
    Attached Thumbnails Attached Thumbnails Y Assembly 014.jpg   Y Assembly 015.jpg   Y Assembly 017.jpg   Y Assembly 018.jpg  

    Y Assembly 020.jpg  
    Gerry

    UCCNC 2017 Screenset
    http://www.thecncwoodworker.com/2017.html

    Mach3 2010 Screenset
    http://www.thecncwoodworker.com/2010.html

    JointCAM - CNC Dovetails & Box Joints
    http://www.g-forcecnc.com/jointcam.html

    (Note: The opinions expressed in this post are my own and are not necessarily those of CNCzone and its management)

Tags for this Thread

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •