Originally Posted by
trmpyro
Here is what I plan to do, based on the information I received from a member on the Platform CNC Group. The attached pictures show what the router internals look like. I purchased the swagelok fitting, actually a Parker brand, 1/4" tube x 1/8"npt male. I am going to drill and tap the bearing sleeve to install the fitting into, off center by about 1/4". The cable from the Super PID will be held in place by this. This looked like a good method based on the pictures I have seen from the other forum. The end of the router shaft will get painted per the installation instructions. I will post pictures when I have it complete.