603,330 active members*
3,109 visitors online*
Register for free
Login
Results 1 to 20 of 159

Hybrid View

  1. #1
    Join Date
    Dec 2020
    Posts
    168

    Re: Working On A New "Timber Frame" Design and Build.

    I have the material for the gantry pretty well all cut and started laying out the gantry column assemblies. .

  2. #2
    Join Date
    Dec 2020
    Posts
    168

    Re: Working On A New "Timber Frame" Design and Build.

    Putting the first column together with the bolt plates installed and loose tenon joints holding it all together.
    Attached Thumbnails Attached Thumbnails IMG_9271.jpg   IMG_9272.jpg   IMG_9273.jpg  

Similar Threads

  1. Profile Rail Wood Frame Router, 25" x 37" x 6" working area
    By jpvonoy in forum CNC Wood Router Project Log
    Replies: 76
    Last Post: 03-01-2019, 03:47 AM
  2. First Build-Steel Frame-Cutting Area 2'3"x2'3"
    By Rock380Star in forum CNC Wood Router Project Log
    Replies: 1
    Last Post: 04-15-2018, 08:10 AM
  3. Replies: 3
    Last Post: 01-21-2017, 11:01 PM
  4. First Router Build, Is The Frame "Beefy Enough"
    By jimbooboo in forum DIY CNC Router Table Machines
    Replies: 2
    Last Post: 04-06-2008, 06:49 PM

Tags for this Thread

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •