Hello,
I am new to this forum as of today. I have just commissioned a Variaxis 630 twin pallet that I got for a steal second hand. The machine is a 2004 with 640 control. I just need a few prompts to help me get my head around the wpc shift and index thing. I am very conversant with Mazatrol having 15 other machines including 3 integrex.
If someone could give me a program example of a 100mm cube block being drilled in the middle of the 5 faces usind a 10mm drill on the top face as the A axis is at 0 and a 15mm drill in face two with the A axis at -90 and the C axis at 0 and a 20mm hole in the third face with the A axis at -90 and the c axis at 90
Make the datum for the first 10mm hole at X=0, Y=0 and Z=0