Thanks Jim, but you might have missed it. I have single phase 240 volt (checked with a DVM) 100 amp service in my building.
If you are referring to the table on page 2-8 it only mentions 100 amp slow blow fuses at 230-240v single phase.
I also understand that I will need to change out the power cord for a 3-wire 6ga cord.
Thanks for the help. Maybe I missed something or maybe I've got under-sized service for an over-sized machine.
I just jumped on this deal without fully understanding it requirements. The only thing I really paid attention to was the single phase 240 volt input.
You've been a ton of help, and I'd like to get this thing up and running and work towards my cnc table goal which I'm sure will pose more questions.
Thanks again,
Ian