We had the riggers move the VMC into place, but I'm pondering how to move it out of the way so we can re-lay the bed of concrete it's sitting on...
The 9000 lbs weight makes it seem my forklift couldn't touch it... (5500 lbs max)
nor any similar conventional method... I have a 1 ton gantry (2k lbs?) and a few
even less suitable products... There isn't enough space to drive in a full size
forklift, not without moving a bunch of other similarily sized objects out of the way first.
At this point I'm actually thinking a few dozen guys and bunch of turned steel bars under the unit...
Any suggestions?