Material: SAE/AISI 1095 Spring Steel
Initial Quantity: 5,000
Time Frame: 8 weeks

Instructions: "Hem can form anyway the vendor prefer, the only constraint is the piecing must be done after hem, and hem must be away from piece direction (see drawing).”

DIMENSIONS ARE IN MM

Will need prototypes first! Thanks.