586,389 active members*
2,910 visitors online*
Register for free
Login
Results 1 to 6 of 6
  1. #1
    Join Date
    Jun 2008
    Posts
    33

    Fanuc OT and FMB Barfeed

    Does anyone have a complete sample program that explains the programming of a FMB Vario barfeed. It is connected to a Miyano BNC 20S. Due to room available the barfeed has only just been attached. I have been using the lathe for 3 years.

    Just slightly stuck on how to call and feed a bar to the stop and so on.

    Thanks

    Will

  2. #2
    Join Date
    Jun 2006
    Posts
    48
    I suppose you just do it by M code, chek plc to find the right one, other bar control are do by the control of berfeeder.
    But is a new installetion or a old never used?

  3. #3
    Join Date
    Jun 2008
    Posts
    33
    The barfeed is an old installation, it just hasn't been connected since I have owned it.

    The lathe manuel show a M83 to perfrom the top cut of a new bar and M85 will feed a bar to a stop.

    From what I can work out, you would have the top cut program and new bar in a sub program which the main program calls when needed?

    Completly unsure about this as I can't find an examples and ther are no programing examples in the boxes of manuels I have.

    This is what is shown for the top cut example -

    M83 = Material Feeder Start

    N1 T0100
    G0 x0.0 z3.0 T0101
    M17
    M83
    M18
    G0 z5.0
    G27 x0.00 T0000
    N2 T0200
    G96 s200 M3
    Go x20 z0.00 T0202 M8
    G01 x-1.0 F0.09
    G0 x 12.0
    Z50.0
    M84


    M84 = Block Delete OFF Reset

    M85 is the ANF material feed command and consists of:
    M17 - chuck chuck open
    M83 Material Feeder start
    M18 Chuck close.

    Just not sure on the correct program layout.

    Thanks

    Will

  4. #4
    Join Date
    Jun 2006
    Posts
    48
    Then the baarfeed is only able to feed the bar and change it?
    If this is true the way is right, use a tool for stop the bar, then run the program the righ number of times, because you must discharge the end of the barUse subrogram or parametric or copy paste

  5. #5
    Join Date
    Jun 2008
    Posts
    33
    The barfeed has a magazine. According to the FMB manuel (no example programs in it) Bar is loaded in to channel, bar is clamped and pusher bar with collet is pushed on to the end of the bar, once bar is used up pusher bar is retracted with bar remnant and clamped, remnant is ejected. New bar loaded from the magazine and the process starts again.

    Does the barfeeder perform this processor on its own when a end of bar signal is received or does this need to be part of the program?

    The more I try and work it out the more I get myself into a muddle!

  6. #6
    Join Date
    Jun 2006
    Posts
    48
    the only way is take a look to eletric connection between cnc and barfeeder....

Similar Threads

  1. Barfeed programming
    By wganders in forum G-Code Programing
    Replies: 18
    Last Post: 08-17-2022, 08:59 PM
  2. smw barfeed
    By Hash01 in forum G-Code Programing
    Replies: 1
    Last Post: 08-07-2009, 07:05 PM
  3. barfeed 300
    By jz25180 in forum Haas Lathes
    Replies: 4
    Last Post: 06-16-2009, 02:39 AM
  4. LNS Barfeed
    By Lazzer65 in forum Uncategorised MetalWorking Machines
    Replies: 4
    Last Post: 08-13-2006, 10:22 AM
  5. Barfeed Option
    By pinguS in forum Fanuc
    Replies: 3
    Last Post: 07-27-2006, 04:26 PM

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •