Orange Co, CA. About a 5 minute walk from Gecko (maker of the popular G540). That's actually what influenced my decision to get the G540, other than it has great reviews. I figured that if I have problems, I can walk over there and hope to be welcomed, lol.
I'm almost done with the build, minus the electronics installation even though I have everything. I'll post more pics on my thread soon. Progress is slow as I only have time to do about 30 minutes of work a day if I'm lucky. I'm in the wood building phase right now so I turn off the router, table saw, and other power tools early for respect of my neighbors.
Once I'm done with the wood cutting, productivity will pick up again because I'll be able to work late at night in the garage with the electronics and other parts of the construction that don't make too much noise. I'm trying to go all out with this build and add as many features as I can fit into the machine. You know, features I'll never use and will only provide for more frustration during installation... yeah, those type of features