HI, I have Index C-200 ABC speedline lathe with Sinumerik controler,
My problem is that the Part catcher has been a bit slow to advance before the subpindle collet opens up to eject the piece out..
that was controled by a cycle of some sort, I am no expert at this G coding, but I have managed to repalace the cycle with
line by line G code and Added a dwell to allow time for advancing the part catcher,
how ever becasue i did that the Belt conveyor where the parts fall into stoped moving..
so I wonder what is the G code or M code or lines I need to add so that the Belt conveyor start moving forward again...
thanks for your help.