I have a project to cut into a wood slab a sculpture of a group of running horses, the cut area will be approximately 12" x 40", the system says it will take approximately 48 hours of run time. Needless to say I don't want to do that in one sitting.
I want to break it down into about four hour segments. My thought is to install X Y and Z limit switches and home them and always start and stop with all the axis homed, how does this sound?
Or is there a better way?
Thanks
HH