Hello everybody
I am working on a Hermle C42U with iTNC530 SP6.
Now I have a work piece where I have to level 4 pre-existing dill holes with the spindle. I have pivoted the piece upwards (A-90) and probed 2 points in Z and adjusted the C axis- that worked.
Now my problem: as there is no probing cycle for the zero point setting for 2 drill holes, I have used 4 drill holes. However with 3 trials I had 2 coordinate systems- that’s not how it should be.
I hope somebody knows an easier solution. Otherwise I will probe and measure 2 already driven drill holes. Then calculate the middle of the Q parameters with the help of the measured values.
Regards Nike
seit über 20 Jahren habe ich Erfahrungen mit folgenden Steuerungen: TNC 151, TNC 155, TNC 407, TNC 426, TNC 430, iTNC 530, iTNC 530HSCI<br />und folgenden Maschinen: Hermle UWF 712, UWF 851, UWF 1002, UWF 902, UWF 1202H, U630T, C800V, C800U, C20U, C40U und C42U. Zeiss-Meßmaschine<br />CAM: OPUS<br />ein wenig Erfahrung hab ich dann auch noch mit: Hurco-Fräsmaschine, Mitutoyo-Meßmaschine<br /><br />im Bereich Erste Hilfe: Rettungssanitäter