Got most of the floating assembly done today, still have to mount the limit switch for it and build the torch clamps and steel plate for the breakaway. Looks like I'll wind up with 11" of Z travel, not bad. A few more limit trips to install and hardstops, command signal wires and time to test and tweak, which is good cause there's steel coming Friday that I'm supposed to try my hardest to have a prototype cut and fabed up by end of next week.....:nutter: Maybe I'll get some sleep and rest next month...