Need help with mazak lathe matrix control, I want to shift the Z work shift in the program (eia) so i can run multiple parts. I'm using the mazak tool data side (G53.5) and not the G54-G59 any help would be great. thanks
Need help with mazak lathe matrix control, I want to shift the Z work shift in the program (eia) so i can run multiple parts. I'm using the mazak tool data side (G53.5) and not the G54-G59 any help would be great. thanks
G52W-(shift amount) If im not wrong.